8
#6 - ASSEMBLY OF 6 AND
10 METERS STUBS
SA
R8SA
R8 Stub SA
3/8"x 52"
1
(1 x 132 cm)
SB
R8SB
R8 Stub SB
1/4" x 6"
2
(0.6 x 15 cm)
SC
R8SC
R8 Stub SC
3/8" x 48"
1
(1 x 121.9 cm)
SD
R8SD
R8 Stub SD
3/8" x 48"
1
(1 x121.9 cm)
SE
R8SE
R8 Stub SE
1/4" x 12"
1
(.6 x 30.5 cm)
105
055105
Black Plastic Cap
1/4"
2
(.6 cm)
407
030407
SS Worm Clamp
7/32"-5/8"
4
(.6 x 1.6 cm)
FIGURE I
Frequency (MHz)
Length
50.250
4-1/2" (11.4 cm)
50.800
3-1/2" (8.9 cm)
51.500
2-1/2" (6.4 cm)
52.500
1-1/2" (13.8 cm)
53. 500
1/2" (1.3 cm)
6 Meter
Tune Chart
KEY
P/N
DISPLAY
DESC
SIZE
QTY
Take the (SA) tube and slide it through the 4-hole insulator and secure
it in the bottom aluminum stub clamp as shown in Fig. "I". Make sure
that the slotted end of (SA) tube protrudes beyond the 4-hole insulator
and the opposite end of (SA) tube is mounted flush with the bottom
of the stub clamp (see callout at bottom of Fig I). In same fashion
slide the tube (SC) and secure it on other side of bottom aluminum
stub clamp. Align the bottom stub clamp with plastic insulators and
secure it tight. Slide the 6" rod (SB) into tube (SA) and secure with
worm clamp (407). Use 6 Meter tuning chart to adjust the stub (SB)
for selected portion of the band. Place the protective plastic cap on
top of (SB)
tuning
rod to complete
the 6 Meter
stub.
Take another 6" rod (SB) and slide it 3" into tube (SC) and secure
with worm clamp (407) as shown in callout of Fig. "I". Slide the tube
(SD) through 3-hole plastic insulator and assemble with worm clamp
(407) over other end of rod (SB). Insert rod ( SE) into tube (SD) as
shown ,and complete the 10 Meter stub by placing the protective
plastic cap on top.
3
”
(7.6 cm)
INSERT
3
”
(7.6 cm)
INSERT
10
”
(25.4 cm)
EXPOSED
SEE 6 METER
TUNE CHART
105
SE
407
407
407
105
SB
SB
407
SD
SC
SA
SC
SA
99
Stubs sit flush with bottom of
stub clamp,on top of BA.
NOTE:
BB
BA
R9