9
#7
-
ASSEMBLYOF12 AND
15 METERS STUBS
KEY
P/N
DISPLA
Y
DESC
SIZE
QTY
3” (7.6 cm)
INSERT
SB
R8SB
R8 STUB SB
1/4"x 6"
4
(.6 x 15 cm)
105
055105
BLACK PLASTIC
1/4"
2
CAP
(.6 cm)
407
030407
SS WORM 7
/32"-5/8"
6
CLAMP
(1.2 x 1.6 cm)
SF
R8SF
R8 STUB SF
3/8" x 72"
2
(1 x 182.9 cm)
SH
R8SH
R8 STUB SH
3/8" x 68"
1
(1 x173 cm)
SG
R8SG
R8 STUB SG
3/8" x 43-1/2"
1
(1 x110.5 cm)
3” (7.6 cm)
INSERT
407
407
SG
SH
SF
SF
FIGURE J1
FIGURE J2
Take two tubes (SF) and slide them through 4-hole plastic insulator
and secure in top stub clamp as shown in Fig. J1. Insert two
6"rods (SB) in (SF) tubes and place the worm clamps (407) as
shown in callout at Fig. J2. Place tube (SH) on left side stub as
shown in Fig. J2, sliding it through 2 and 3 hole plastic insulators.
Insert tube (SG) on the right side stub as shown and secure with
worm clamp. Take two (SB) rods and insert them on top of these
two stubs as shown in top callouts of Fig. J2 along with protective
end caps.
Note: Make sure that all stubs are positioned around main radiator
as shown in Fig. J2
407
407
SF
SF
3-1/2” (8.9 cm)
EXPOSED
3” (7.6 cm)
INSERT
3” (7.6 cm )
INSERT
3-1/2” (8.9 cm )
EXPOSED
105
105
SB
SB
SB
SB
R9