14
Pre-testing and final inspection
The product is checked and tested in the Manufacturer’s plant before being delivered to the customer.
The “production process check sheet” enclosed with it guarantees that
each
step in the production process, from assembly to packaging, was carefully checked from both the operating and
safety standpoints.
After installing the appliance, to complete the installation, carry out
A
,
B
and
C
.
A
Checking the installation is correct
Mark with a “√“ all the boxes of the table below: this will confirm the installation is complete and correct.
√
Positioning checks
Is the installation room adequate and compliant with regulations? (minimum, maximum temperature, etc.)
Is the appliance resting on a perfectly level floor?
Have the minimum distances stated been complied with?
Has the protective film been removed from the surfaces?
√
Electrical checks
Does the mains voltage match the data on the rating plate?
Do electric connections meet current regulations in the country of installation and follow the diagrams supplied?
√
Miscellaneous
Does the user have all the documentation relative to the product?
B
Checking the operation and first start-up
Start the appliance following the instructions in the “Use and Maintenance” manual annexed: monitor it during the whole test and check that all the electrical components work properly.
C
Warranty activation
At the end of the test, the warranty
MUST
be activated.
IF NOT REGULARLY ACTIVATED, THE VALIDITY OF THE SAME STARTS FROM THE INVOICE DATE AND NOT FROM THE ACTUAL INSTALLATION
DATE.
4
FINAL OPERATIONS