Part No. 4801-1020 Rev 2-2015
Super-Saver XL 250 Heater
– 120 Volt, 60Hz, ETL
Page
8
of 22
5.
Installation
5.1 Hanging The Heater
Chain Suspension
Cable Suspension
Mount the heater with chain hooks and chains so
that the back of the heater is at least 12 inches (305
mm) from the ceiling and wall. The heater must be
a minimum of 20 inches (508 mm) from floor, and
located so that livestock and combustible materials
are unable to come in contact with heater or within
10 ft (3 meters) of the hot air discharge.
If frequent height adjustment is required, use
cables and pulleys. Main line cable would be
connected to a winch.
5.2 Directions for Leveling
Adjust cables or chains as
required to level the heater.
Use a carpenter's level to check
that the heater is level.
5.3 Installing Dual-Flare Duct
Fold Dual-Flare duct to shape
as shown in
Fig. 1
. Install Dual-
Flare duct to heater exhaust
(
Fig. 1
) as shown with sheet
metal screws provided. This
provides a multi-directional heat
flow that may be set by bending
flaps.
5.4 Connecting the Gas Supply
For gas connection (
Fig. 2
)
attach regulator to the Hi-
Pressure Line (
A
) at outside of
building. Connect flexible hose
(
B
) to low pressure end of
regulator with special brass
coupling. See
Section 2
and natural gas requirements.
Fig. 2
A
B
High Pressure
Line
Gas Regulator
Flexible
hose
Figure 2
Figure 1
Flare Duct
Attach Flare
Duct To
Heater With
Sheet Metal
Screws
Adjust Flap To
Direct Heat Flow