5. Installation
PNEG-499
Cycle Plus Pan Feeder
33
Winch Kit Installation
After deciding where the feeder line is to be installed, mark a straight line on the ceiling or rafters the full
length of the feeder line. Use a string, chalk line, or a winch cable temporarily attached with staples to mark
the line. Center the line directly over where the feeder line is to be installed.
Each loop requires two (2) winches; one per feeder line. Winch each side of the loop as though it was a
straight line feeder.
Figure 5AE
Required Winch Drop Line Locations:
A. 8' or 10' spacing
B. One on each side of the drive unit
C. One to hang each drive unit
D. One on each side of the feed hoppers
E. One to hang each feed hopper
F. On each end of the feed line near the nylon elbows
G. One between the nylon elbows
Ref #
Description
A
Winching Drop Line Locations
Summary of Contents for PNEG-499
Page 1: ...PNEG 499 Cycle Plus Pan Feeder Installation and Operation Manual PNEG 499 Date 01 01 15...
Page 2: ...2 PNEG 499 Cycle Plus Pan Feeder...
Page 48: ...48 PNEG 499 Cycle Plus Pan Feeder NOTES...
Page 52: ...52 PNEG 499 Cycle Plus Pan Feeder NOTES...
Page 53: ...7 Parts List PNEG 499 Cycle Plus Pan Feeder 53 Grilled Centerhouse Control Unit Components...