5. Installation
PNEG-499
Cycle Plus Pan Feeder
17
Grilled Feeder Assembly (Continued)
Slide the proper number of feeder assemblies onto each tube section. The feed tube tabs will slide through
the slot at the top of the drop tube.
Center the feeders over the holes and rotate the feeders on the tube with the tabs on the tube pointing
directly downward. The slots on the bell end of the tube should be aligned horizontally when the tabs are
pointing downward.
Figure 5H
Place the anti-rotation clips around the tubing and insert them into the slots in the top of the drop tube
(Two required). Being certain that the pan is level, lock the anti-rotation clips in place using the nuts and
bolts provided.
Figure 5I
Ref #
Description
M
Anti-Rotation Clip (Two Required)
Summary of Contents for PNEG-499
Page 1: ...PNEG 499 Cycle Plus Pan Feeder Installation and Operation Manual PNEG 499 Date 01 01 15...
Page 2: ...2 PNEG 499 Cycle Plus Pan Feeder...
Page 48: ...48 PNEG 499 Cycle Plus Pan Feeder NOTES...
Page 52: ...52 PNEG 499 Cycle Plus Pan Feeder NOTES...
Page 53: ...7 Parts List PNEG 499 Cycle Plus Pan Feeder 53 Grilled Centerhouse Control Unit Components...