10
Installation
With the exception of media containers, open the remaining containers, remove all the
components, and inspect them before starting installation.
Placement
Refer to figure 1 for system placement.
• Set the media tank on a solid, level surface near water, drain and electrical facilities.
• Set the brine system on a flat, smooth, solid surface as near the media tank as possible.
Tank Assembly
Before the unit can be connected to the plumbing the manifold distributors must be assembled
and the underbedding and resin must be loaded into the tank for 12”, 14” and 16” tanks.
Position of the Mineral Tank(s)
Determine the location for the mineral tanks(s) prior to loading, since they will be difficult to move
after the underbedding and gravel are loaded.
Caution!
DO NOT lay the tank down unless a suitable lifting device is available.
Personal injury and damage to the unit can result if dropped.
Note:
Read this section entirely before starting the installation. Follow all applicable
plumbing and electrical codes.
Drain Line
Hard Water In
Heater
Treated Water Out
To
Hose
Bibs
Water
Meter
or
Pump
Air Gap
Softener
Brine Tank
Figure 1