13
ASSEMBLY INSTRUCTIONS
9 .
b. Position the Infrared Zone Side Burner (DD)
through the opening in the Infrared Support
Frame (DC).
C
DD
DC
c. Make sure that the Infrared Zone Side Burner
(DD) engages the Side Burner Valve (CC) gas
jet, as shown in figure D.
D
CC
DD
5
X 1
YOU WILL NEED:
d. Assemble the Infrared Zone Side Burner (DD)
to the Infrared Zone Support Frame (DC), at
the 2 points indicated in figure E.
e. Feed the Infrared Zone Electrode set (DE)
from underneath the Infrared Zone Side
Burner (DD), through the small opening on
the left side of the Infrared Zone Support
Frame (DC). Align and assemble the
electrode using the self tapping screw
provided, as shown in figure F.
E
F
DE
DD
DC
DC
DD
Front, right side view
View from underneath right side shelf
View from above right side shelf
View from above right side shelf
6
X 2
X 2
X 2
YOU WILL NEED:
3
9
10
Summary of Contents for Ceramic 850 85-3126-2
Page 29: ......