9
ASSEMBLY INSTRUCTIONS
5.
6.
a. Open the Lid. Assemble the Left Side Shelf
Assembly (DJ and DK) to the Cart Assembly
by inserting the Side Shelf Tabs into holes on
the Cart Assembly (figure A).
b. Secure using hardware, as shown in figure B,
C & D.
Front, left side view
View inside burner box
DJ
DK
A
BA
Attach the Upper Back Panel (CM) to both the
Left and Right Cart Side Panels (EA and EB).
Only install hardware in the bottom portion of
the Upper Back Panel (CM), as shown in figure
B.
DO NOT TIGHTEN SCREWS UNTIL SIDE
SHELF HAS BEEN INSTALLED.
Back view
Close up
EA
CM
EB
EA
CM
B
A
6
X 2
X 2
X 2
YOU WILL NEED:
1
6
7
6
X 2
X 2
X 2
YOU WILL NEED:
6
8
2
B
DJ
BA
DK
Summary of Contents for Ceramic 850 85-3126-2
Page 29: ......