Start-up
Preliminary checks / leakage test
Setting air pressure switch
Burner start up simultaneously involves
starting up installation by the fitter or his
representative; only they can guarantee
boiler house compliance with currently
accepted practices and regulations in
force.
The fitter must first be in possession of a
“certificate of gas fuel conformity ”
issued either by the approved body or
distributor and also have leak-tested and
drained pipework upstream from the
quarter-turn hand-operated valve.
Preliminary checks
• Check the following:
- nominal available voltage and
electrical frequency and compare
them with values found on
identification plate,
- polarity between phase and neutral
- previously tested earth wire
connection,
- lack of potential between neutral and
earth,
• Make sure there is no current.
• Close fuel valve.
• Read boiler and regulator
manufacturer service instructions.
• Check the following:
- boiler is full of pressurized water,
- circulator(s) work(s),
- valve(s) open,
- combustion air supply to the boiler
house and combustion product
exhaust pipe are working correctly
and compatible with burner capacity
and fuel,
- electrical protection equipment
outside burner are present,
calibrated and set,
- boiler regulator circuit is set.
- gas type and distribution pressure
are suited to the burner.
Setting air pressure switch
• Check the connection of the flexible
piping of the pressure tap on the
+
of
the pressure switch.
• Remove transparent cover. Unit
includes a
index and graduated
mobile disk.
• Provisionally set pressure controller to
the minimum value shown on
graduated disk.
Leakage test
• Connect a pressure gauge to pressure
take-off located upstream from gas
manifold.
• Open quarter-turn hand-operated
valve.
• Check supply pressure.
• Use a purpose designed medium to
check air-tightness of gas manifold
connections, including external filter.
No leak should be found.
• Vent the pipe downstream of the
manual valve by a quarter of a turn
whilst protecting the gas valve inlet.
• Reclose drain valve.
Summary of Contents for NC12 GX107/8
Page 2: ...10 2007 Art Nr 13 017 700B 2...
Page 41: ...10 2007 Art Nr 13 017 700B 41 4 b 1 2 180 4 J1...
Page 42: ...10 2007 Art Nr 13 017 700B 42 5 1 5 2 6 3 7 4 7 8 3 11 S3 N 4 N 5 N 2...
Page 43: ...10 2007 Art Nr 13 017 700B 43...
Page 45: ...10 2007 Art Nr 13 017 700B 45 NC12 G31 NC12 3 4 5 NC16 NC21 NC16 21 3 4 5...
Page 51: ...10 2007 Art Nr 13 017 700B 51 230...
Page 53: ...10 2007 Art Nr 13 017 700B 53 20 3 3 1 0 50 2 15 25 103 2 MB DLE Y 2 Y 0 9 10000...
Page 55: ...10 2007 Art Nr 13 017 700B 55 7 W J2 2 2 V J1...
Page 56: ...10 2007 Art Nr 13 017 700B 56 SG 113 SG 513...
Page 57: ...10 2007 Art Nr 13 017 700B 57...
Page 58: ...10 2007 Art Nr 13 017 700B 58...
Page 59: ...10 2007 Art Nr 13 017 700B 59...