Chute Assembly
1.
Remove wing nut and hex screw from chute control
assembly and clevis pin and cotter pin from chute support
bracket. See Fig. 3-3.
Fig. 3-1
Fig. 3-2
Fig. 3-3
NOTE:
Remove all loose parts and any packing material before
assembling.
NOTE:
References to right or left side of the snow thrower are
determined from behind the unit in the operating position.
NOTE:
This Operator’s Manual covers several models, handle
panels, lights and chute cranks are some features that may vary
by model. Not all features referenced (or engines pictured) in
this manual are applicable to all snow thrower models.
NOTE:
For models with electric start the extension cord is
fastened with a cable tie to the rear of the auger housing for
shipping purposes. Cut the cable tie and remove it before
operating the snow thrower.
Handle Assembly
1.
Place the shift lever in the Forward-6 position.
2.
Observe the lower rear area of the snow thrower to be sure
both cables are aligned with roller guides. See Fig. 3-1.
Pull
up on the upper handle, align the upper handle with the
lower handle. See Fig. 3-2.
3.
Secure the handle by tightening the plastic wing knob
located on both the left and right sides of the handle.
Remove and discard any rubber bands, if present. They are
for packaging purposes only.
Chute Control Assembly
Chute
Chute Support
Bracket
Chute Base
Assembly & Set-Up
3
7
Summary of Contents for 31AH55TA596
Page 24: ...24 Notes ...
Page 25: ...24 Notes ...