Operation
35
The BIOSAFE
®
120/220/420 MDß may only be oper-
ated by trained personnel !
The BIOSAFE
®
120/220/420 MDß may only be in-
stalled and commissioned (initial commissioning) by
Cryotherm Service staff or by personnel trained by
the Cryotherm Service staff.
The fill line consists of:
1.
Decanting hose DN10 , 1.5 metres, normally insulated
2. 90
o
– screwing
Proceed as follows during assembly:
The fill line is fastened to its 90° elbow union with the union nut
of the fill connection.
7 Operation
7.1 Installation / Assembly
7.1.1 Assembly of the Fill Line
Summary of Contents for BIOSAFE 120
Page 1: ...Operating Manual BIOSAFE 120 220 420 MD Service Hotline 49 0 2741 95 85 75...
Page 2: ......
Page 31: ...Safety 27 5 1 Safety Safety advices Handling with cryogenic liquefied gases Source IGV Germany...
Page 32: ...Safety 28...
Page 33: ...Safety 29...
Page 51: ...Accessories 47 660 mm 95 mm 165 mm CHRONOS 220 Towers 77031511 95 x 165 mm...