7
V locating the Boiler
FIGurE 5.0: clEarancES
WARNING
Failure to observe the following location requirements could result in property damage, a fire,
explosion or carbon monoxide (CO) hazard.
1) Clearances:
•
Observe the minimum clearances shown below. Except as noted, these clearances apply to all combustible construction,
as well as noncombustible walls, ceilings and doors. Also see Figure 5.0.
Front - 24” (from front jacket surface)
Left Side – 6”
Right Side – 6” (18” is required for tankless heater service)
Rear – 12”
Top – 6”
Single Wall Chimney Connector (to combustible construction) - 18”
•
A 24” service clearance is recommended above the top of the boiler, as well as on the side to which the burner swing
door opens (the left side as the boiler is shipped). See also dimension ‘B’ in Table 2.0 for recommended service clear
-
ances to the front of the boiler. These clearances may be reduced to those shown above; however, servicing the boiler
will become increasingly difficult as these clearances are reduced.
Summary of Contents for FSZ080
Page 2: ......
Page 14: ...12 FIGURE 6 4 ALLAIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM...
Page 18: ...16 FIGURE 8 1 STEAM BOILER PIPING FOR GRAVITY RETURN...
Page 26: ...24 FIGURE 10 2 TWO PIPE GRAVITY FEED SYSTEM NOT RECOMMENDED FIGURE 10 3 TWO PIPE LIFT SYSTEM...
Page 29: ...27 FIGURE 11 0 WIRING CONNECTIONS DIAGRAM STEAM CG450 PROBE LWCO...
Page 30: ...28 FIGURE 11 1 CONNECTIONS WIRING DIAGRAM FOR BURNER SPECIFIC PRIMARY CONTROL...
Page 31: ...29 FIGURE 11 2 INDIRECT WATER HEATER FIELD WIRING...
Page 41: ...39 Notes...
Page 43: ...41...
Page 45: ...43...
Page 47: ...45...
Page 51: ...Notes...