Table 4.2: Clearances From Vent Piping To Combustible Construction
TYPE OF VENT PIPE
PIPE DIRECTION
ENCLOSURE
MINIMUM CLEARANCE
TO COMBUSTIBLE
MATERIAL
80/125 and 60/100mm
CONCENTRIC VENTING
VERTICAL OR
HORIZONTAL
ENCLOSED ON ALL FOUR SIDES
0”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
VERTICAL OR
HORIZONTAL
AT LEAST ONE SIDE OPEN,
COMBUSTIBLE MATERIAL ON A
MAXIMUM OF THREE SIDES
1”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
HORIZONTAL OR VERTICAL
WITH OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
VERTICAL WITH NO OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2”
5
Summary of Contents for BIMINI BUDDY BWC090
Page 2: ......
Page 9: ...7 Figure 5 1 Wall Mounting Hole Locations ...
Page 10: ...Figure 5 2 Boiler Mounting Hardware 8 ...
Page 43: ...FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT 41 ...
Page 56: ...54 Figure 10 1 Wiring Connections Diagram ...
Page 57: ...55 Figure 10 2 Ladder Diagram ...
Page 58: ...56 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Page 76: ...74 ...
Page 79: ...77 ...
Page 80: ...78 ...
Page 81: ...79 ...
Page 82: ...80 ...
Page 84: ...82 150 151 152 153 154 155 ...
Page 85: ...83 156 157 158 159 160 161 ...
Page 86: ...162 84 ...