© 2006 Cronyx
11
Section 2. Installation
Section 2. Installation
2.1. Site Requirements
The device should be grounded properly before powering on. Grounding screw located
on the front panel of the device.
Allow at least 10 cm clearance at the front of the device for cable connections.
The ambient operating temperature should be 0 to 50 °C, at a relative humidity of up to
80%, non-condensing.
2.2. Delivered Items
E1-L/S unit of a version as ordered ......................................................1 piece
Bracket for mounting the E1-L/S unit in a 19-inch cabinet .............2 pieces
Self-adhesive foot for the E1-L/S unit ..................................................4 pieces
Power cable (for the «-AC» version) ....................................................1 piece
3-screw removable terminal block (for the «-DC» version) .............1 piece
This Installation and Operating manual .............................................1 piece.
2.3. Connections
All connectors are located on the front panel of the modem.
Figure below shows the front panel of the device ordered with Ethernet V.35 / RS-530 /
RS-232 / X.21 digital port and identifies connector locations:
Alarm Port
Console Port
E1 Link
Power
GND
SNMP Port
PWR TST
PORT 0
LINK 0
SNMP
CONSOLE ALARM
Digital Port
Summary of Contents for E1 - L/S
Page 50: ...50 Modem Converter E1 L S 2006 Cronyx ...
Page 51: ... 2006 Cronyx 51 ...