Crescent SC430 53 B GO FULL PKG Operator'S Manual Download Page 18

ENGLISH 

INSTRUCTION FOR USE 

 

MAINTENANCE 

 

WARNING!

 

Maintenance  procedures  must  be  performed  after  the  machine  is  turned  off  and  the  battery 
charger cable is disconnected. In addition, carefully read the safety chapters in the manual.

 

 

All scheduled or extraordinary maintenance procedures must be performed by qualified personnel or an authorized 
Service Center. This manual only describes the general and common maintenance procedures. 
For  other  maintenance  procedures  that  are  not  in  below  maintenance  schedule  table,  please  refer  to  the  Service 
Manual that can be consulted at any our company Service Center. 

 

SCHEDULED MAINTENANCE TABLE  

 

CAUTION! 
The procedure marked with (1) must be performed when the machine is used after 9 hours for the 
first time.

 

 

The procedure marked with (2) must be done by Service Center that qualified by 

our company

Procedure 

Daily, after 

each use 

Weekly 

semiannually 

Yearly 

Battery charging 

 

 

 

 

Squeegee cleaning 

 

 

 

 

Brush/Pad-holder cleaning 

 

 

 

 

Tank cleaning 

 

 

 

 

Tank sealing strip inspection 

 

 

 

 

Float ball filter cleaning 

 

 

 

 

Squeegee blade check and replacement 

 

 

 

 

Cleaning water filter cleaning 

 

 

 

 

Suction filter cleaning 

 

 

 

 

WET battery fluid level check 

 

 

 

 

Screw and nut tightness inspection 

 

 

1

 

 

Brush/Pad-holder carbon brush check or 

replacement 

 

 

 

2

 

Suction motor carbon brush check or 

replacement 

 

 

 

2

 

 

BATTERY CHARGING 

 

NOTE 
Please charge the batteries when the yellow  LED (43) or red LED (44) is on, or at the end of each 
working cycle. 

 

CAUTION!

 

Always keep the battery in a full charged state can extend its lifetime. 

 

CAUTION!

 

Please charge the battery as soon as possible if the battery level is low, otherwise the lifetime of 
battery can be reduced. It is better to check the battery at least once a week. 

 

CAUTION!

 

If no on-board charged is equipped, use a qualified external charger for battery charging. 

15 

Summary of Contents for SC430 53 B GO FULL PKG

Page 1: ...SC430 www crescentindustrial co uk Operator manual English...

Page 2: ...ret i overensstemmelse med f lgende direktiver og standarder Den tekniske fil er udarbejdet af fabrikanten Il sottoscritto dichiara che i modelli sopra menzionati sono prodotti in accordo con le segue...

Page 3: ...ICATON LIGHT 7 OPERATING GUIDE 7 INSTALLING AND SETTING OF NEW MACHINE BATTERY 8 BRUSH PAD HOLDER INSTALLATION AND UNINSTALLATION 10 ADJUSTING THE BALANCE OF SQUEEGEE 10 SOLUTION TANK FILLING 11 REGUL...

Page 4: ...of conformity are provided together with the machine documentation ACCESSORIES AND MAINTENANCE All the necessary operation maintenance and repair procedures must be performed by qualified personnel o...

Page 5: ...exceeding that is defined in the specification SYMBOLS THAT APPEAR ON THE INSTRUCTION FOR USE MANUAL DANGER It indicates a dangerous situation with risk of death for the operator WARNING It indicates...

Page 6: ...40 C the humidity of air must be between 30 95 Do not use the machine on slopes with a gradient exceeding as specification show When using and handling floor cleaning detergents follow the instructio...

Page 7: ...ways keep the openings free from dust hairs and any other foreign material which could reduce the air flow Do not use the machine if the openings are clogged Use the machine only where a proper lighti...

Page 8: ...RUCTURE as shown in Figure 1 Note Applies ONLY to machine with battery charger which is optional 1 Safety switch 2 Handlebar 3 Control panel 4 Serial number plate technical data conformity certificati...

Page 9: ...ENGLISH INSTRUCTION FOR USE Figure 1 6...

Page 10: ...several times flashing It is the first stage of charging 2 After charging some time the red LED 49 turns off the yellow LED 50 turns on this is the second stage of charging 3 After charging about 10...

Page 11: ...r to the installation and settings of batteries WET or GEL AGM batteries are already installed and ready to be used 1 Connect the battery connector 9 to the machine then turn on the power switch 45 2...

Page 12: ...connect squeegee lifting 12 and squeegee bracket 19 place the squeegee lifting to suitable place for battery installation 11 Place the sewage suction hose and drain hose to suitable place for not pre...

Page 13: ...with suitable personnel protection devices such as gloves to reduce the risk of accidents Proceed as following 1 Make sure that the power switch 45 is turned to off position o 2 Lift the tank 25 by p...

Page 14: ...ILLING CAUTION Use only low foam and non flammable detergents that are intended for automatic scrubber applications When using the cleaning detergents please follow the instructions on the labels of d...

Page 15: ...ebar 2 and lean back machine until assist wheels B Figure 11 touch the ground 6 After machine is whole stop uninstall the brush pad hold NOTE To thoroughly suck dry the water in drain hose when you ju...

Page 16: ...reased suddenly to remind operator emptying the recovery tank The vacuum system is deactivation and the floor is not dried CAUTION If the vacuum system is turned off accidentally For example when the...

Page 17: ...ter working before leaving the machine 1 Remove brush or pad holder as shown in previous section 2 Empty recovery tank and solution tank according to related paragraphs 3 Perform daily maintenance See...

Page 18: ...vice Center that qualified by our company Procedure Daily after each use Weekly semiannually Yearly Battery charging Squeegee cleaning Brush Pad holder cleaning Tank cleaning Tank sealing strip inspec...

Page 19: ...le external charger 6 Connect battery connector to the charger and then connect charger to the supply mains 7 Disconnect the charger connector to the machine after charging is completed Use on bard ch...

Page 20: ...rity of the front and rear squeegee blade whether there is any gap or crack If necessary replace it by below steps Loosen the clip D to separate the fastener from the bracket A take off the clip bar E...

Page 21: ...er support frame E and filter sponge I After cleaning fix the float ball D into the filter support frame E and then align the mark groove L of the bottom cap F of the float ball filter with the mark g...

Page 22: ...e machine 3 Turn off the water spray valve A Figure 17 4 Take off the transparent lid of the valve B and then take off the filter C install them to the filter box D after cleaning 5 Open the water spr...

Page 23: ...EAKER F2 VACUUM CIRCUIT BREAKER F3 SOLENOID WATER VALVE FUSE M1 BRUSH MOTOR M2 VACUUM SYSTEM MOTOR SW1 POWER SUPPLY SWITCH SW2 BRUSH ACTIVATION PUSH BUTTONS SW3 VACUUM SWITCH SW4 BRUSH SWITCH HM HOUR...

Page 24: ...tank sealing strip abrasion Cover the lid correctly or replace the sealing strip Spray water not enough Filter with dirt Clean the filter Squeegee leaves trace Debris or fragments on squeegee blade R...

Page 25: ...r purchase For more information or a cleaning solution to suit your business please get in touch Berrington House Berrington Road Leamington Spa CV31 1NB t 0845 33 77 695 f 0845 33 78 695 e info c ind...

Reviews: