background image

Trendsetter NEWS SA

4

Trendsetter NEWS SA

Operator Operations and Maintenance

Operations

Turn on the output device

2

These operations are required for some of 
the maintenance procedures listed below.

Turn off the output device

3

Reset the output device

8

Maintenance

Work To 

Be Done

How 

Often

Date Work 

Completed

Exterior surfaces

Clean

Weekly

Load ramp

1

Clean

Plate roller *

9

Clean

Monthly

Edge detection strips *

10

Clean

Every three 
months

Compressed air supply 
fi lters:

Six months 
or as 
needed

5 micron fi lter *

4

Replace

0.01 micron fi lter *

5

Replace

Intake air fi lter *

7

Replace

Universal Debris Removal 
Cabinet (UDRC) fi lter **

6

Replace

As needed

N/A

* Procedures for these items are included in this visual quick reference guide.
**  Optional equipment—media dependent.

Note:  This document is not intended as a substitute for the 

Trendsetter NEWS SA 

Operator Guide

. Refer to the operator guide for detailed procedures.

Software may display differently depending on the version of Print Console in use.

4

5

1

3

2

6

7

8

OFF

ON

9

10

Optional

Summary of Contents for Trendsetter NEWS SA

Page 1: ...www creo com Copyright 2005 Creo Inc All rights reserved Internal 732 00041A EN RevA Visual Quick Reference English 653 00979A EN A February 2005 Trendsetter NEWS SA...

Page 2: ...Lights Operator Action Imaging Light Flashing green Wait the device is imaging a plate Load Light Flashing green Semi automatic mode load one or two plates for imaging OR Semi automatic mode wait the...

Page 3: ...1 In Prinergy click OK to submit the le 1 In Brisque click Submit to submit the le 1 In Print Console click Open to submit the le 2 Right click the job and select Approve The output device receives t...

Page 4: ...ess the Start button 8 Unload the media 4 Position media on the load ramp 3 Remove all slip sheets The load light ashes green The load light glows solid green Media alignment label The imaging light a...

Page 5: ...trips 10 Clean Every three months Compressed air supply lters Six months or as needed 5 micron lter 4 Replace 0 01 micron lter 5 Replace Intake air lter 7 Replace Universal Debris Removal Cabinet UDRC...

Page 6: ...Replace the O ring if necessary 6 Reattach the bowl by pushing it up and turning it to the right until it clicks Turn on the compressed air 90 psi 0 01 micron lter 4 Clean inside the bowl 5 Replace th...

Page 7: ...ng each strip once in one direction only 4 2 3 2 3 Locate the blue plate roller Dampen a cloth with water and slide the cloth over the plate roller To close the panels a Pull down the front panel and...

Page 8: ...ntake air lter from inside the fan box panel b Push the upper corners of the fan box panel in until you hear both latches click Intake air lter Part number 55 0700 Fan box panel 1 Clean the intake air...

Page 9: ...Pull down the front panel and rotate the locking latches b Pull down the top panel and then push on the two corners to lock the internal latches 2 1 The device suspends activity CAUTION Wear protecti...

Reviews: