4 of 8
LPN00644X0007A0_A
SECTION 2:
ON GRID MOUNTING - CONTINUOUS ROW RECESSED MOUNTING
CAUTION:
Ceiling contractor must provide
an uninterrupted, continuous rough opening
utilizing
tee grids
spaced 4” center to center.
Length of opening should be determined from
Figure 7 on next page.
Tee grids and luminaire
must be secured to structure above to support
weight of luminaire.
CAUTION:
Do not attempt to assemble
luminaire rows on the ground and then lift
into position. This may create stress at the
connection points and may result in damage
and/or mechanical failure.
CAUTION:
Do not connect power in a run until
all of run is installed, wire harnesses connected,
and luminaire joints completed.
STEP 1:
Remove lens and LED/reflector tray and set
aside in order of run placement for reinstalling
later. To remove lens, carefully slide a plastic
card or putty knife between the lens and
extrusion towards the end of the luminaire.
Using the plastic card or putty knife, push the
lens inward until the lens come free.
After
removing the lens, remove the Philips head
reflector screws, remove the LED Reflector Tray,
and disconnect the LED harness. Set lens and
LED Reflector tray aside. See
Figure 1 and 2.
STEP 2:
Locate and install End Cap Kits. Install End Cap
with (4) #6 screws from end cap kit. The end
cap has to be trimmed, the amount depends on
the run length. Each notch corresponds to the
successive Trim Length section in the chart on
the next page (See
Figure 7
). In order to install
the end cap on the male end of the luminaire,
replace the male joiner bracket with the female
joiner bracket and remove the alignment pins.
See
Figure 4 and 6.
STEP 3:
Lay the first luminaire Right-Hand End
of the Row into the grid per
Figure 7
grid
requirements.
STEP 4:
Position second luminaire in row such that it aligns
with joint end (male end) of first luminaire. Attach
using customer supplied hardware to structure
above. Connect the second luminaire to the first
luminaire as shown in
Figure 5 and 6
. Plug wire
harness together and push excess wire into
luminaire wiring chamber, ensure that wires are
not pinched.
STEP 5:
Push luminaires tightly together while making
sure the alignment pins slide into the interior
tracks of each luminaire and span the luminaire
joint. Secure joint by tightening supplied keps
locknuts on threaded studs of male joiner
bracket. Attach safety wires to luminaire safety
wire bracket and structure above as shown in
Figure 5 and 6
.
STEP 6:
Continue to install and assemble row following
steps 1-5 above. Using one of the 7/8" dia.
holes on the End unit (Left-Hand End of Run)
luminaire, install conduit connector and make
electrical connections per Section 5 “Electrical
Connections”.
STEP 7:
Replace LED trays and lens that was removed in
Step 1 above, ensure that no wires are pinched.
4
5
6
End Cap
End Cap
LED Tray
Lens
Safety Wires
Safety Wires
(Supplied by Others)
Safety Wires Brackets
Alignment Pins
Male End
Female End
Male End
Female End
End Plate Cap (After
Trimming Has Been Done)
(4) #6 Screws
7/8" Plugged Hole
for Conduit Entry
5/8" Plugged Hole for
Threaded Rod Attachment
(Off-Grid Mounting ONLY)