© Copyright 2014, Creative Playthings
MODEL PS18EAS
19862-700 Rev A (07-20)
Page 12
ASSEMBLY INSTRUCTIONS
STEP 9 — Left Wall Support & Roof Uprights:
Orient the Left Wall Support (K) as shown at right. Fasten
the Left Wall Support to the Left Front Post using a 1/4 x 2"
Hex Bolt Assembly though the top hole and a 1/4 x 2" Lag
Screw with Flat Washer in the bottom hole.
Fasten the Left Wall Support to the Back Left Post and one
Roof Upright (M) using two 1/4 x 3-1/2" Hex Bolt Assemblies
as shown.
Fasten the Left Wall Support to the left Midpost and one
Roof Upright (M) using two 1/4 x 3-1/2" Hex Bolt Assemblies
as shown.
STEP 10 — Right Wall Support & Roof Uprights:
Secure the Right Wall Support (L) to the Front Right Post,
then the Back Left Post and Roof Upright (M), then the Mid-
post and Roof Upright (M) as in the previous step.
STEP 11 — Angle Braces:
Ensure the structure is in the place it will be used. Make
any needed ground adjustments before proceeding.
Use a level to determine that all horizontals are level and
posts are plumb. Make sure the tower stands solidly on the
ground.
Fasten two Angle Braces (A) to the Platform Left using two
1/4 x 3" Hex Bolt Assemblies as shown. Fasten the bottom of
the braces to the adjacent posts using 1/4 x 3" Lag Screws
with Flat Washers.
Be sure to drill 3/16" diameter pilot
holes in the posts before using the Lag Screws.
Fasten two Angle Braces (A) to the front and back of the
lower platform using two 1/4 x 2" Hex Bolt Assemblies as
shown. Fasten the bottom of the braces to the adjacent
posts using 1/4 x 3" Lag Screws with Flat Washers.
Be sure
to drill 3/16" diameter pilot holes before using the Lag
Screws.
K
M
M
M
A
A
A
B
3-1/2" Hex Bolts
2" Hex
Bolt
2" Lag
Screw
M
L
B
3-1/2" Hex
Bolts
2" Hex
Bolt
2" Hex
Bolt
2" Hex
Bolt
3" Hex
Bolts
All lag
screws 3"
2" Lag
Screw
Front of
Tower