background image

Assembly

NORTHBRIDGE WOOD ROOF

19950-100 Rev C (05-18)

© Copyright 2016, Creative Playthings

Page 7

COMPONENT VIEW

AA  2  35321-102  Leg 4 x 4 x 80"

AB  1  35322-102  Rung Leg 4 x 4 x 80"

AC  1  35323-102  Step Leg 4 x 4 x 80"

AD  2  35324-102  Main Beam 2 x 10 x 76"

AE  2  35327-102  Side Support 2 x 4 x 27-7/8"

AF*  1  35335-102  Stringer 2 x 4 x 66-7/8"

AG* 1  35336-102  Swivel Stringer 2 x 4 x 66-7/8"

AH* 1  40508-100  Cargo Net

Northbridge Wood Roof

AI  4  35343-102  Corner Post 4 x 4 x 61-1/2"

AJ  2  35173-102  End Support 2 x 6 x 55"

AK  4  35189-102  End Rafter 2 x 4 x 46-1/2"

ADL 2  35190-102  Mid Rafter 2 x 4 x 46-1/2"

AM 20  35273-402  Roof Board (Brown)  5-1/8 x 7/8 x 55-1/4"

AN  3  35342-102  Ceiling Joist 2 x 3 x 14-1/2"

 

1  50559-900  Wood Roof Screws

J  6  35246-102  Rock Board 5/4 x 6 x 27-1/4"

K  1  35247-102  Rope Board 5/4 x 6 x 27-1/4"

L  4  35248-102  Spacer Board 5/4 x 6 x 27-1/4"

M  1  35325-102  Rock Base Rail 2 x 6 x 59-3/4"

N  1  35326-102  Rope Base Rail 2 x 6 x 59-3/4"

O*  1  35328-102  Step Support 2 x 4 x 64-7/8"

P  1  35329-102  Rung Support 2 x 4 x 64-7/8"

Q*  2  35330-102  Center Block 4 x 4 x 5"

R*  2  35331-102  Inside Beam 2 x 6 x 66-7/8"

S  1  35332-102  Ladder Plat End 2 x 6 x 40-1/2"

T*  1  35333-102  Stair Platform End 2 x 6 x 40-1/2"

U  1  35449-102  Narrow Spacer 54 x 4 x 27-1/4"

V  1  50277-100  Rock Pack (12), Green

W  1  40400-100  Climbing Rope

X*  1  15133-400  Slide Mount, Green
Y  5  14203-400  Steel Rung, Green 1" Dia x 18"
Z  10  15154-400  Rung Collar, Green, 1" Dia x 7/8"

A  1  33978-102  Ladder Slat 5/4 x 4 x 18-3/4"

B  9  35202-102  Wall Slat 5/4 x 6 x 29-1/2"

C  5  35334-102  Ladder Step 2 x 6 x 15-1/2"

D  8  35337-102  Deck Board 5/4 x 6 x 47"

E*  1  35338-102  Ctr Deck Board 5/4 x 6 x 46-7/8"

F  4  35339-102  End Deck Board 5/4 x 6 x 40-3/8"

G  1  35340-102  Upper Support 2 x 6 x 47"

H  1  35341-102  Upper Rope Support 2 x 6 x 47"

4  15034-100  Plastic Handgrip, Yellow

 

1  50559-700  Northbridge Hardware

Component Part Identification:

Take inventory of all parts, making sure nothing is missing or 

defective. If you find that parts are missing or defective call 

the Creative Playthings Customer Service Department at 

1-800-598-4997.         *  Not visible in illustration on Page 6

NORTHBRIDGE BOX 1 - 63085-641

NORTHBRIDGE BOX 2 - 63085-642

NORTHBRIDGE BX 3 - 63085-603

63085-645

Boxes for Northbridge Wood Roof

63085-641  Northbridge Box 1

63085-642  Northbridge Box 2

63085-603  Northbridge Box 3

63085-645  Northbridge Wood Roof

63045-505  Tire Swing & Swivel

8570-202 

10 Ft. Green Wave Slide

63080-101  3 Position Swing Beam

AA934-204  2 Swings, 1 Trapeze

Other Parts

AS  1  8570-202  10 Ft. Green Wave Slide

 

  63080-101  Classic Pine 3 Position Swing Beam (Swing  

 

   

Mount included with Swing Beam)

AT    63045-505  Tire Swing and Swivel

Summary of Contents for NORTHBRIDGE WOOD ROOF

Page 1: ...t care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for chi...

Page 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Page 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Page 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Page 5: ...SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighte...

Page 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AJ AI AM W AK AL AS AT S V Y Z AA L AN...

Page 7: ...Spacer 54 x 4 x 27 1 4 V 1 50277 100 Rock Pack 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x...

Page 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Page 9: ...k Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten a Post AI to the Main Beam and plat...

Page 10: ...e Support H to the Posts on the left side of the gym using four 5 16 x 4 1 2 Hex Bolt Assemblies Note the position of the rope hole in the Upper Rope Support The hole should be closest to the back of...

Page 11: ...to Back With the help of another person gently tip the assembly onto its back with the Weld Nuts facing the ground STEP 7 Step Leg Slide the Step Leg AC into place between the back Main Beam and the b...

Page 12: ...in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rope Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Left B...

Page 13: ...n using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 12 Rung Leg Slide the Rung Leg AB into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush to...

Page 14: ...Side Support AE to the Rope Base Rail using one 5 16 x 3 Hex Bolt Assembly through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into th...

Page 15: ...STEP 18 Steps Slide the Ladder Steps C into the Slots in the Step Support and the Step Leg Make the bottom front edge of each Step even with the face of the Step Support and Step Leg Fasten the Steps...

Page 16: ...ling Screws through the pre drilled holes from below Drill the Screws up through the steel pipe until the head of the screw is flush with the surface of the wood STEP 22 Stringers Fasten the Stringer...

Page 17: ...using four 10 x 2 1 2 T25 Screws Use 1 8 diameter pilot holes to ensure the screws do not split the Rung Support and Leg Align the bottom edge of the Rope Board K with the bottom edge of the Rung Supp...

Page 18: ...alling seven more Roof Boards sliding them under the previous Roof Board and fastening the Roof Boards using 8 x 1 5 8 Screws Leave off the final two Roof Boards for now Final Roof Boards Before attac...

Page 19: ...her Fasten a Ceiling Joist AN to the outside of the Roof Rafters on each end Use two 5 16 x 3 Hex Bolt Assemblies Fasten the remaining Ceiling Joists to the other Roof Raf ters using two 5 16 x 3 Hex...

Page 20: ...HE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EX TREME DANGER TO YOUR CHILDREN Figure 8 Knot STEP 30 Hand Grips Place one Hand Grip I flat against the outside face of the left back Po...

Page 21: ...t when fully tightened Pull down on the cargo net to tighten the knots Fasten the bottom of the Cargo Net to the Rope Base Rail by passing the end of each rope through a hole and tying a knot At least...

Page 22: ...re the holes in the Slide are over the Slide Mount Ensure the Slide extends out perpendicular from the Playset Drill 5 16 holes through the Slide Slide Mount and Deck Boards us ing the holes in the Sl...

Page 23: ...Assembly NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Copyright 2016 Creative Playthings Page 23 ASSEMBLY INSTRUCTIONS...

Reviews: