background image

© Copyright 2016, Creative Playthings

NORTHBRIDGE WOOD ROOF
19950-100 Rev C (05-18)

Page 2

PLAYSET SAFETY

Observing the following statements & warnings reduces the likelihood of serious or fatal injury:

•  Children should use equipment only in its intended manner.
•  Children should not wear loose or stringed clothing while using playground equipment.
•  Children should not play on equipment in wet weather conditions due to potentially slippery surfaces.
•  Children should NOT walk too closely in front of, behind, or between moving swings and trapezes.
•  Children should NOT swing empty swing seats.
•  Children should NOT jump off swings and/or trapeze while they are in motion.
•  Children should NOT twist swing chains because this will reduce the strength of the chains.
•  Children should sit in the center of the swings with their full weight on the seats.
•  Children should NOT be on the top surface of the swing beam.
•  Children should NOT use the equipment in a manner other than intended.
•  Children should NOT get off the equipment while it is in motion.
•  On-site adult supervision is required at all times for children of all ages.
•  Until assembly is complete, DO NOT let your children use the Play Set.
•  Never fasten anything not approved by Creative Playthings to your Play Set. Accessories or items not ap-

proved by Creative Playthings include; Dog runs, clothes lines, electrical devices, or bird feeders etc.

•  Suspended ropes, chains, and cables must be secured at both ends.
•  Suspended ropes, chains, and cables must not be capable of looping back on themselves.
•  Do not allow more than 120 lbs. on Single occupancy swing accessories such as the Sling Swing and Trapeze.
•  Do NOT allow more than 175 lbs. on multiple use swing accessories such as the Back-to-Back Plastic Glider.
•  Do NOT allow more children on the Play Set than can simultaneously use all the swing stations at one time.

•  Children MUST NEVER wear bicycle helmets while playing on the play-set.

Assembly Safety:

•  Adult assembly required
•  Face slide away from the sun.
•  Keep the work area clean and clear of obstructions.
•  Children should stay out of the work area until the safe play area is cleared of obstacles, the Play Set has been 

completely assembled, all hardware has been tightened and checked, and all tools have been picked up. 

•  Keep children off the Play Set until it has been completely assembled.
•  Parts of the assembly process may require help from another competent adult.
•  Do not stand on the platform until the Play Set has been completely assembled, use a step ladder if you can  

not reach high enough.

•  Follow the manufacturers' safety recommendations for the tools and equipment you use.
•  Avoid assembling your Play Set in poor weather conditions.
•  Wear proper clothing and safety equipment (safety glasses, boots, and gloves) while assembling your Play Set.

FOR SAFETY SAKE, PLEASE TAKE TIME TO READ ALL INSTRUCTIONS COMPLETELY AND 

CAUTION YOUR CHILDREN APPROPRIATELY.

Summary of Contents for NORTHBRIDGE WOOD ROOF

Page 1: ...t care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for chi...

Page 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Page 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Page 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Page 5: ...SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighte...

Page 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AJ AI AM W AK AL AS AT S V Y Z AA L AN...

Page 7: ...Spacer 54 x 4 x 27 1 4 V 1 50277 100 Rock Pack 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x...

Page 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Page 9: ...k Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten a Post AI to the Main Beam and plat...

Page 10: ...e Support H to the Posts on the left side of the gym using four 5 16 x 4 1 2 Hex Bolt Assemblies Note the position of the rope hole in the Upper Rope Support The hole should be closest to the back of...

Page 11: ...to Back With the help of another person gently tip the assembly onto its back with the Weld Nuts facing the ground STEP 7 Step Leg Slide the Step Leg AC into place between the back Main Beam and the b...

Page 12: ...in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rope Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Left B...

Page 13: ...n using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 12 Rung Leg Slide the Rung Leg AB into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush to...

Page 14: ...Side Support AE to the Rope Base Rail using one 5 16 x 3 Hex Bolt Assembly through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into th...

Page 15: ...STEP 18 Steps Slide the Ladder Steps C into the Slots in the Step Support and the Step Leg Make the bottom front edge of each Step even with the face of the Step Support and Step Leg Fasten the Steps...

Page 16: ...ling Screws through the pre drilled holes from below Drill the Screws up through the steel pipe until the head of the screw is flush with the surface of the wood STEP 22 Stringers Fasten the Stringer...

Page 17: ...using four 10 x 2 1 2 T25 Screws Use 1 8 diameter pilot holes to ensure the screws do not split the Rung Support and Leg Align the bottom edge of the Rope Board K with the bottom edge of the Rung Supp...

Page 18: ...alling seven more Roof Boards sliding them under the previous Roof Board and fastening the Roof Boards using 8 x 1 5 8 Screws Leave off the final two Roof Boards for now Final Roof Boards Before attac...

Page 19: ...her Fasten a Ceiling Joist AN to the outside of the Roof Rafters on each end Use two 5 16 x 3 Hex Bolt Assemblies Fasten the remaining Ceiling Joists to the other Roof Raf ters using two 5 16 x 3 Hex...

Page 20: ...HE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EX TREME DANGER TO YOUR CHILDREN Figure 8 Knot STEP 30 Hand Grips Place one Hand Grip I flat against the outside face of the left back Po...

Page 21: ...t when fully tightened Pull down on the cargo net to tighten the knots Fasten the bottom of the Cargo Net to the Rope Base Rail by passing the end of each rope through a hole and tying a knot At least...

Page 22: ...re the holes in the Slide are over the Slide Mount Ensure the Slide extends out perpendicular from the Playset Drill 5 16 holes through the Slide Slide Mount and Deck Boards us ing the holes in the Sl...

Page 23: ...Assembly NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Copyright 2016 Creative Playthings Page 23 ASSEMBLY INSTRUCTIONS...

Reviews: