© Copyright 2016, Creative Playthings
NORTHBRIDGE WOOD ROOF
19950-100 Rev C (05-18)
Page 14
ASSEMBLY INSTRUCTIONS
STEP 14 – Fasten Beam to Platform Frame:
Make sure the tower is in place, solidly set into the ground.
Check to make sure the Posts are plumb and the platform is
level. Make sure the angled ends of the legs rest flat against
the posts.
Fasten the Main Each End of the Main Beams to the Plat-
form Ends using 3/8 x 8" Lag Screws and 3/8" Flat Washers.
Tighten all fasteners securing the Beams
to the Posts
STEP 16 – Side Supports:
Loosely fasten one Side Support (AE) to the
Rope Base Rail using one 5/16 x 3" Hex Bolt
Assembly through one hole.
Swing the Side Support to rest against the
side of the Leg. Mark and drill a 1/4" diameter
pilot hole into the Leg.
Add another 5/16 x 3" Hex Bolt Assembly to
the Side Support and Base Rail. Use a 5/16 x
3-1/2" Lag Screw with a 5/16" Flat Washer to
secure the Side Support to the Leg. Tighten
all fasteners.
Repeat with the other Side Support on the
other side of the gym.
STEP 15 – Legs to Posts:
Use a 5/16" diameter drill to bore pilot holes into the
Posts
where the holes in the legs meet the posts. Fasten
the Legs to the Posts using 3/8 x 5-1/2" Lag Screws and 3/8"
Flat Washers.
AE
3/8 x 8" Lag Screw
3/8 x 5-1/2" Lag Screw
5/16 x 3-1/2" Lag Screw
5/16 x 3" Hex Bolt