Assembly
NORFOLK II
19944-200 Rev E (01-19)
© Copyright 2016, Creative Playthings
Page 9
ASSEMBLY INSTRUCTIONS
STEP 1 – Platform Frame:
Locate the Cargo Platform End (GG), Step Platform End
(HH), and the two Inside Beams (N). Lay them out as shown
at right. Orient the Inside Beams with the larger holes nearer
the bottom. Orient the Platform Ends so the holes in the ends
of the boards are near the top. Make sure the other holes
in the Platform Ends are aligned as shown.
Use four 5/16 x 4-1/2" Lag Screws with four
5/16" Flat Washers to fasten the Step
Platform End to the right of the Inside
Beams. Fasten the Cargo Platform
End using two 5/16 x 4-1/2"
Lag Screws with two 5/16"
Flat Washers on the bottom
holes only. Do not fasten
the top holes.
STEP 2 – Stringers:
Fasten the Stringer (H) to each Platform End
in the position shown using one 5/16 x 3-1/2"
Lag Screw and Flat Washer in each end. The
wide surface of the Stringer should be flush
with the top of the Platform Ends.
Fasten the Tire Stringer (I) to each Platform
End nearer the front of the gym in the posi-
tion shown using one 5/16 x 3-1/2" Lag Screw
and Flat Washer in each end. The surface
with the larger holes should be flush with the
top of the Platform Ends.
Larger hole
on bottom
Fasten using
bottom holes
only
Larger hole
on bottom
Align with end
hole at the top
5/16 x 4-1/2"
Lag Screw
5/16 x 3-1/2"
Lag Screw
N
N
H
R
I
HH
GG
Back of the Gym
Front of the Gym
Left side of the Gym
STEP 3 – Top Climber Block:
Align the holes in the Top Climber Block (R) to the holes
in the Cargo Platform End in the position shown. Join the
Top Climber Block, the Cargo Platform End, and the In-
side Beams using one 5/16 x 5-1/2" Lag Screw and Flat
Washer in each end. Secure the middle of the Climber
Block with three #8 x 1-5/8" Screws.
Left side of the Gym
Back of the Gym
5/16 x 5-1/2"
Lag Screw
#8 1-5/8"
Screw
7/8"