background image

© Copyright 2016, Creative Playthings

NORFOLK II
19944-200 Rev E (01-19)

Page 16

ASSEMBLY INSTRUCTIONS

STEP 22 – Platform Boards:

Place one End Deck Board (Y) so it overhangs the Step 

Platform End by 1/4". Lay one End Deck Board next to it. 
Butt an End Deck Board to the Top Climber Block on the 

other end of the GymLay another End Deck Board next to it. 
Lay the Deck Boards (Q) across the Stringers and Inside 

Beams in the pattern shown at right. Space all the Boards 

evenly between the outer-most End Deck Boards. Secure 

the Boards using #8 x 1-5/8" Screws in each hole.

STEP 23 – Climber Boards:

Insert four 1/4" Weld Nuts into the four center-most 5/16" 

diameter holes in the Top Rock Board (U1). Flip the board so 

the Weld Nuts are face down.
Align the top edge of the Top Rock Board 2" down from the 

top edge of the Step Support. Secure the Rock Board to the 

Step Support and front left Leg using four #10 x 2-1/2" T25 

Deck Screws. Use 1/8" diameter pilot holes to ensure the 

screws do not split the Step Support and Leg. Pilot holes 

are  especially  important  at  the  top  and  bottom  of  the 

Step Support and Leg.
Drill 3/16" diameter pilot holes and secure 1/4" x 2-1/2" Lag 

Screws and Flat Washers through the 5/16" holes near the 

ends of the Top Rock Board
Before installing the rest of the boards set the Weld Nuts 

at  the  bottom  of  the  Leg  and  Step  Support  flush  with  the 

surface. Use a hammer to drive the weld nuts flush and then 

tighten the Bolts.
Insert four 1/4" Weld Nuts into the four 5/16" diameter holes 

in another Rock Board (U2). Flip the board so the Weld Nuts 

are face down Align the bottom edge of one Rock Board 1" up 

from the bottom edge of the Step Support and Leg. Secure 

the Rock Board to the Step Support and Leg using four #10 

x 2-1/2" T25 Deck Screws. Use 1/8" diameter pilot holes 

to ensure the screws do not split the Step Support and Leg.
Place the five Spacer Boards (V) and remaining four Rock 

Boards as shown at right. Secure the Spacer and Rock 

Boards evenly spaced between the top Rock Board and 

Rope Board using four #10 x 2-1/2" T25 Deck Screws. Use 

1/8" diameter pilot holes to ensure the screws do not split 

the Rung Support and Leg. The gap between boards will be 

approximately between 1/4" and 3/8".

STEP 24 – Rocks:

Fasten a Climbing Rock (J) to each pair of holes in the Rock 

Boards. Use 1/4 x 1-1/2" Hex Bolts, 1/4" Lock Washers, 8mm 

Flat Washers and 1/4" weld nuts. Do not over-tighten the 

fasteners. The bolt must seat completely into the Climbing 

Rock, and not protrude more than a 1/8" past the end of the 

weld nut. Protruding bolts can be a hazard to users, replace 

any protruding bolts.

J

V

U1

U2

Q

Q Q

Q

Q

Q

Q

Q

Q

Y

Y

Y

Y

Typical gap: 1/4" 

to 3/8"

1" from Bottom

Set Weld 

Nuts flush

1/4" Overhang

Butt End Deck Board to 

Climber Block

1/4 x 1-1/2" Hex Bolt

#10 x  2-1/2"

T25 Deck Screw

1/4 x  2-1/2"

Lag Screw

#10 x  2-1/2"

T25 Deck Screw

2" gap

Summary of Contents for NORFOLK II

Page 1: ...t carefully read the entire instruction manual before proceeding with the assembly or use of your new play set Creative Playthings takes great care to design its products with your child s safety in m...

Page 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Page 3: ...cause it to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures...

Page 4: ...her 1 4 x 1 1 2 Lag Screw 1 4 x 2 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer Hole Cap 5 16 Lock Washer 5 16 Lock Nut 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4...

Page 5: ...X 2 1 2 CREATIVE PLAYTHINGS PLAY SETS USE A FEW STANDARD CONNECTIONS BECOME FAMILIAR WITH THESE CONNECTIONS TO EASE ASSEMBLY AND ENSURE A SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assemb...

Page 6: ...Copyright 2016 Creative Playthings NORFOLK II 19944 200 Rev E 01 19 Page 6 PLAYSET VIEW A B D C E F G J M O Q T U2 V X Y Z BB AA CC DD FF EE HH K II L JJ LL U1...

Page 7: ...73 102 End Support 2 X 6 X 50 1 8 F 1 35374 102 End Rope Support 2 X 6 X 50 1 8 G 4 35375 102 Corner Post 4 X 4 X 63 1 2 H 1 35378 102 Stringer 2 X 4 X 70 7 8 I 1 35429 102 Tire Stringer 4 X 4 X 70 7...

Page 8: ...inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts monthly during...

Page 9: ...one 5 16 x 3 1 2 Lag Screw and Flat Washer in each end The wide surface of the Stringer should be flush with the top of the Platform Ends Fasten the Tire Stringer I to each Platform End nearer the fro...

Page 10: ...Fasten the End Support E to the Posts on the left side of the gym using four 5 16 x 4 Hex Bolt Assemblies Note the position of the rope hole in the End Rope Support The hole should be closest to the...

Page 11: ...Support at the back of the assembly D STEP 7 Weld Nuts on Back Insert four 3 8 Weld Nuts into the Main Beam at the back of the assembly in the positions shown Make sure the threads inside the Weld Nu...

Page 12: ...wn using two 5 16 x 4 Hex Bolt Assemblies STEP 11 Right Front Leg Slide one Left Leg AA into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush...

Page 13: ...with the holes in the Main Beam Fasten the Right Leg to the front Main Beam with 3 8 x 4 Hex Bolt Assemblies Fasten the Leg to the Cargo Base Rail as shown using two 5 16 x 4 Hex Bolt Assemblies STEP...

Page 14: ...n each end of the Main Beams to the Platform Ends using 3 8 x 7 Lag Screws and 3 8 Flat Washers Tighten all fasteners securing the Beams to the Posts STEP 17 Legs to Posts Use a 5 16 diameter drill to...

Page 15: ...teners Repeat with the other Side Support on the other side of the gym Front of the Gym Front of the Gym STEP 21 Steps Slide the Plastic Steps K into the Slots in the Step Support and the Step Leg Mak...

Page 16: ...he Leg and Step Support flush with the surface Use a hammer to drive the weld nuts flush and then tighten the Bolts Insert four 1 4 Weld Nuts into the four 5 16 diameter holes in another Rock Board U2...

Page 17: ...2 Hex Bolt Ridge Cap Part B Ridge Cap Part A STEP 27 Assemble Ridge Cap Align Ridge Cap Part A DD overlapping Ridge Cap Part B EE as shown at right Ensure that the ends of the Ridge Cap parts align b...

Page 18: ...Mount with the top of the Wall Support Use a level to make sure the Swing Mount is plumb Mark the position of the holes in the Swing Mount on the Beam and Support Drill 3 8 diameter holes through the...

Page 19: ...OR LOOSE ENOUGH TO FORMALOOP THIS PRESENTS EXTREME DANGER TO CHILDREN Overhand Knot Figure 8 Knot T STEP 34 Tire Swing Locate the Tire Swing Assembly JJ and place it beneath the Gym Platform Make sur...

Page 20: ...de Fasten using 1 4 x 3 Truss Head Bolts and 1 4 Weld Nuts Note If a framing member is encountered stop drilling after piercing the Deck Board Remove the Slide Mount and Deck Board and insert the Weld...

Reviews: