REF: JC102 - JUNGLE CLIMBER midi
pg 19 of 46
Instal Assembly Instructions
ENSURE the positioning of the MT1 is correct
The MT1 timber is bolted through 1st HOLE (either end) onto the VT1 & VT7 timber s CIRCLED RED BELOW
Use the ‘TIMBER MARKER GUIDE’ to mark the MT1 Timber
Mark a line around the MT1 timber - 1878mm from the end as shown below
16
17
VT1
VT7
MT1
MT1 TIMBER positioned LEVEL
Dimension shown is from FGL
(Finished ground level)