1.8.
Water Damage
mportant It is recommended to install water detection leads, connected to alarm or
remote surveillance centers and/or to a water circuit shut-off device.
Water damage in a data processing site is generally due to:
•
•
•
•
•
extinguishing fires with water sprays,
leaks in the air-conditioning system,
leaks in water-pipes passing through the Computer Room,
water rise following heavy rain,
leaks in the cooling unit water supply.
1.9.
Computer Room Floor
For optimum installation of equipment, you are advised to equip your Computer Room with
both a primary and raised floor.
1.9.1.
Primary Floor
WARNING
The primary floor must bear a minimum load of 1000 daN/m
2
.
The primary floor and wall risers located at raised floor level must be coated with dustproof
paint or varnish. The floor must be sloped and equipped with a drain.
1.9.2.
Raised Floor
CAUTION
A raised floor compliant with the Standards NF P67 103-1 and 103-2 in force is mandatory,
in particular for the installation of a Cooling Unit.
CAUTION
If the air-conditioning unit(s) is (are) placed on brackets in the room, it is mandatory to
electrically isolate these brackets from the raised floor slabs, crossbeams, and actuators.
A raised floor allows even distribution of the overall system load and provides a plenum
space for cabling and air-conditioning.
The raised floor must be made of 60 cm x 60 cm, removable, interchangeable, square slabs
supported by adjustable flat-head actuators (18 per silo), fitted with electrically conductive
rubber pads.
The structure must be reinforced by intermediate crossbeams or T-beam section spars,
according to slab cut-outs and the hardware load.
At the actuator base, the structure must be meshed with > 10mm
2
section, flat, tin-plated
copper braiding compliant with the Standard NF EN 50.147-2 in force.
1-10
- Site Preparation Guide