![CRANE PUMPS & SYSTEMS BARNES E Series Installation And Operation Manual Download Page 13](http://html.mh-extra.com/html/crane-pumps-and-systems/barnes-e-series/barnes-e-series_installation-and-operation-manual_2679255013.webp)
SINGLE PHASE,115/ 230 VOLT AC (PSC)
Power Cable
(28a)
Motor Lead Number
Green (Ground)
Green
Black
1
White
2
Flag Terminal
Capacitor
Flag Terminal
Capacitor
THREE PHASE, 200/230 VOLT AC
Power Cable
(28a)
Motor Lead Number
Green (Ground)
Green
Black
1 & 7
Red
2 & 8
White
3 & 9
4, 5 & 6 Together
THREE PHASE, 460 VOLT AC
Power Cable
(28a)
Motor Lead Number
Green (Ground)
Green
Black
1
Red
2
White
3
4 & 7 Together
5 & 8 Together
6 & 9 Together
Fig. 8
POWER
Large Cable
MOTOR LEADS
G L1 L2 L3
G T1 T2 T3 T4 T7 T5 T8 T6 T9
G
R
E
E
N
B
L
A
C
K
R
E
D
W
H
I
T
E
G
L1 L2
G
1
2
POWER CABLE
MOTOR LEADS
CAPACITOR
G
R
E
E
N
W
H
I
T
E
B
L
A
C
K
G
L1
L2
L3
G T1 T7 T2 T8 T3 T9 T4 T5 T6
MOTOR LEADS
POWER
Large Cable
G
R
E
E
N
B
L
A
C
K
R
E
D
W
H
I
T
E
13