GALOPPINO
USAGE AND MAINTANENCE MANUAL
Manual no.
Ed.
Date
Pag.
MCA1001-EN-ED05
05
12/09/14
27/31
This document is the property of CRAMARO TS s.r.l. and cannot be reproduced, even if only partially, without the written authorisation
of the company
Pag 27
ORDINARY MAINTENANCE (PREVENTIVE)
OBJECT OF THE CHECK
FREQUENCY
INTERVENTION EXPECTED
ESTIMATED
TIME
SLIDING DEVICES, PLANARITY OF THE
UPPER PROFILES OF THE BOX
DAILY
VISUAL CHECK OF THE CONDITIONS
AND POSSIBLE ABSENCE OF SOME
PIECES
5 MINUTES
PRESENCE OF ALL THE ACTIVE
SAFETY EQUIPMENT OF THE
TARPAULIN
DAILY
VISUAL CHECK OF THE PRESENCE
AND STATE OF CONSERVATION OF
LATERAL CABLES, HOOKS AND
ANCHORAGE SNAP HOOKS
5 MINUTES
SAFETY EQUIPMENT AND LOCKING
THE OPERATING ROD, ETC.
DAILY
VISUAL CHECK OF THE PRESENCE
AND STATE OF CONSERVATION OF
THE ELEMENTS
2 MINUTES
STATE OF THE PULLEYS
DAILY
VISUAL CHECK OF THE INTEGRITY
1 MINUTE
STATE OF THE FRONT RETURN
PULLEYS
DAILY
VISUAL CHECK OF THE INTEGRITY’
1 MINUTE
TERMINALS OF THE PULLING CABLES
WEEKLY
CHECK AND TIGHTEN THE SCREWS
WITH A MANUAL KEY (NOT ELECTRIC
SCREWDRIVERS )
5 MINUTES
ELECTRICAL CONTACTS
WEEKLY
REINSTATE THE CONTACT BY
CLEANING IT AND CHECK CORRECT
CLEARANCE
15 MINUTES
ELECTRIC CABLES
WEEKLY
INSULATE WITH ADHESIVE TAPE OR
REPLACE THE CABLES WITH
DEFECTS OR LACERATIONS
15 MINUTES
SELF-RELEASING TARPAULIN
SYSTEM
WEEKLY
CH ECK FOR ANY DEFORMATIONS
OF THE RODS OF THE PLASTIC
PARTICULARS
15-20
MINUTES
INTEGRITY OF THE METAL PULLING
CABLES
WEEKLY
REPLACE THE CABLES WITH WIRES
STICKIING OUT IMMEDIATELY
40 MINUTES
GENERAL NUTS AND BOLTS
WEEKLY
CHECK TIGHTNESS AND PRESENCE
OF THE TIGHTENING BOLTS OF THE
TARPAULIN ELEMENTS
15-20
MINUTES
METAL WORK IN GENERAL
WEEKLY
CHECK OF THE STATE OF
CONSERVATION OF THE SURFACES
INTEGRITY OF THE ELEMENTS
5 MINUTES
PULLING CABLES
WEEKLY
DETAILED VISUAL CHECK OF THE
SLIDING CABLES AND POSSIBLY
CLEANING OF THE PINS BY A SQUIRT
OF DEOXIDISING DETERGENT OF
THE“ SVITOL TYPE“
15-20
MINUTES
SLIDING SHOES
WEEKLY
VISUAL CHECK OF THE PRESENCE
OF ALL THE SHOES
2 MINUTES
TARPAULIN CANVAS
WEEKLY
DETAILED VISUAL CHECK OF THE
SURFACES OF THE CANVAS AND
ABOVE ALL OF THE ANCHORAGE
POINTS TO THE BOX
5 MINUTES
REMOTE CONTROL BATTERIES
WEEKLY
REPLACE THE FLAT BATTERIES WITH
NEW ONES
2 MINUTES