Model 30 Pavement Router Manual
Operating Instructions
Chapter 5
©2018 by Crafco, Inc. All Rights Reserved……………..…………………..……………………..….Operating Instructions 5-16
Step
Action
12
Install 3/8” street elbow, 3/8” bronze ball valve, 3/8 x 1/4” reducing bushing, and straight
hose connector on opposite side of water tube assembly. Orientation should follow line of
handle bar, pointing towards the blade guard.
13
Cut 1 piece of 3/8” plastic tube approximately 8” long. Connect it to the barbed tee fitting
and the inside barb on the blade guard. Cut another piece that will go between the barbed
tee and the shutoff valve. Use the remainder of the tube to cut a piece that goes between
the outside barb on the blade guard and the barb tee.
14
Inspect the machine; make sure there are no loose or missing parts. Reconnect the
battery cable. Run the Router for a few minutes to insure proper operation.
15
Install the belt guard.
Table 5-12 Saw Cut Attachment Installation (continued)