Silo Operating Instructions

Summary of Contents for EuroMix Silo

Page 1: ...Silo Operating Instructions...

Page 2: ...CTING MOTOR MAINS SUPPLY CABLE 7 CORRECT CONNECTION OF WATER SUPPLY 8 ELECTRICAL INSPECTION TESTING 8 SILO OPERATION Page 9 FILLING A MORTAR TUB 9 MORTAR CONSISTENCY 9 CLEANING Page 10 11 DAILY CLEANI...

Page 3: ...r months or if frost is at all likely please follow the cold weather working guide It is important that you protect the control panel from frost damage as this will also prevent any downtime from dama...

Page 4: ...MIXER SET UP SPLIT PANEL WATER PANEL MAINS SUPPLY WATER IN MIXER ELECTRICAL PANEL 4...

Page 5: ...STANDARD PANEL 5 MAINS SUPPLY WATER IN MIXER...

Page 6: ...s the green On button The mixer shaft will then start to turn the water valve will open and the water pump will operate You can tell if the machine is operating by checking the shaft is rotating clock...

Page 7: ...trol panels will contain this switch There are multiple sockets on the panel for the mixer motor vibrator and mains inlet It is important that these are all correctly connected All cables should be vi...

Page 8: ...included prior to the silo connection All CPI EuroMix silo equipment will be inspected and tested prior to the commencement of the hire A certificate showing the results of the test will be issued fo...

Page 9: ...ERATION 9 Adjust the mortar to the required consistency by slowly turning the black water tap This can be found on the left hand side of the combined panel or inside the water panel on a split unit Th...

Page 10: ...narrow rubber insert section Off Remove Remove 10 ClEaNiNg Regular cleaning is essential to ensure continued performance of the mixer Wet mortar will set hard so it is important the mixer is emptied o...

Page 11: ...mber by removing the securing nut with a 19mm spanner and swing the motor to the side 9 Secure the motor into place using the securing bolt 8 Place the mixing chamber back over the mixing screw and se...

Page 12: ...and store in a frost free location 2 Complete the daily clean 3 Turn off the water supply 4 Remove both the supply and feed pipes from the panel For further advice on frost protection please refer to...

Page 13: ...s x 3 metres minimum for single silo installations 6 metres x 3 metres single silo installations or for silo swap outs 9 metres x 3 metres minimum for triple silo installations Clear access suitable f...

Page 14: ...required Plugs are pushed in correctly all plugs Check condition of cables and plugs Check RCDs in panel not tripped Check site electricity supply is live Unplug vibrator if in use Check for correct...

Page 15: ...pply fully open Check for water leaks Are there other users connected to water supply Toilets washrooms etc Freezing conditions Can cause flow restrictions Check water valve is open on panel Check hos...

Page 16: ...AX Tel 44 0 161 777 7500 Fax 44 0 161 777 7501 Leeds Stadium Park Altofts Lane Whitwood Castleford WF10 5PZ Tel 44 0 1977 523 300 Fax 44 0 1977 523 333 Northfleet Robins Wharf Grove Road Northfleet Ke...