2.8.3
Programming DIP switch SW3 for DSS Board #903132-xx
DIP switch SW3 on the dual-speed starter must be set correctly. Failure to do this may result
in improper anode RPM and therefore may damage the X-ray tube.
The dual-speed starter must be programmed to match the input voltage to the generator and the phase
shift capacitors connected to the board. The phase shift capacitor configuration is identified by a label
located on the back of the DSS panel. This programming is done by setting SW3
1)
Power Main Line Input Setting
CAUTION: ENSURE THAT SW3-8 SETTING MATCHES THE LINE INPUT VOLTAGE, WHICH
SHOULD MATCH THE AUXILIARY TRANSFORMER LINE VOLTAGE TAP SELECTION
IN SECTION 2.10.1 OF THIS DOCUMENT.
For generators with a mains input of
400 VAC
-
Set SW3 - 8 - OFF
For generators with a mains input of
480 VAC
-
Set SW3 - 8 -
ON
2)
Capacitor Configuration Setting
Set SW3, switches 1 to7 according to the subassembly tab number labeled on the back of the
DSS panel (see Figure 2-10A).
Example above is configured for a panel assembly 9XXXXX-12, 400V Line Input.
See the next two tables for a list of all the Tab number and their corresponding DIP switch SW3
settings.
Use and disclosure is subject to the restrictions on the title page of this CPI document.