CPICDMOPINST
Page - 7
SALES + SERVICE
(905) 829-2355
www.cpishine.com
FILLING THE TANK WITH GRANULATE
Place the drying material inside the “Nautilus” tub as follows:
Switch on the machine by lifting the stainless steel lid and pressing the Main Power
switch. Press the “Start” icon located on the front control panel of the Silvershine.
Gently close the lid.
Remove the cutlery chute lid from the machine.
Open the bag of granulate – for FLOOR MODELS the bag contains slightly more
than one full load (10 -15% more). The bag for a CDM Star contains approx. four
loads. Once the bag is open, pour it into the tub and save the remainder of the
granulate for topping up the tub at a later date.
Replace the cutlery chute lid.
Failure to replace the manufacturer approved drying/polishing granulate on a
timely and regular basis (every 4 months) will lead to the automatic forfeiture
of warranty rights and the Manufacturer will not be obliged to perform any
repairs and/or replacements.