Cotek BP-1205A User Manual Download Page 9

 

3-1-2.ON / OFF switch

 

Power ON / OFF switch, leave the status OFF during installation. 

3-1-3.LED Status 

Charging Status 

LED Signal 

LED Indication 

Bulk Charge 

 

Fast Green Blink 

Absorption Charge 

 

Slow Green Blink 

Floating Charge 

 

Solid Green 

Charging Failure 

or 

Wire Disconnection

 

Red Blink 

3-2. Rear Panel Operation

 

STATUS

     DC 

OUTPUT

PUSH

FUSE

  DC 

 

3-2-1.Ventilation Shaft

 

Be sure to keep it a distance (at least one inch) from surrounding 

things. 

3-2-2.DC Output Terminals

 

Connect it to 12V/24V batteries. 

+

indicates positive, 

-

indicates negative.    Reverse polarity  

connection will blow the internal fuse and may damage BP-

□□□□

permanently. 
 

 

Summary of Contents for BP-1205A

Page 1: ...BP A Series Switch Mode 3 Stage Battery Charger User s Manual...

Page 2: ...g Curve 3 2 2 Electrical Characteristics 4 2 3 Mechanical Drawing 5 3 Instructions 6 3 1 Front Panel Operation 6 3 2 Rear Panel Operation 7 3 3 Troubleshooting 8 3 4 Battery Type Selections 8 Copyrigh...

Page 3: ...mpartment Overheating may occur 1 1 2 To avoid the risk of fire and electronic shock make sure that existing wiring is in good electrical condition and not undersize Do not operate BP A Battery Charge...

Page 4: ...mmediately 1 2 2 Never smoke or make a spark or flame in the vicinity of the battery or the engine 1 2 3 Do not drop metals on the battery The resulting spark or short circuit on the battery or other...

Page 5: ...or Advanced 8 bit microprocessor control circuit Reverse polarity protected by fuse Ignition protection Output short circuit protection Over power protection Switch mode technology Statue of charge in...

Page 6: ...Coefficient 0 03 C 0 50 C Vibration 10 500Hz 1G 0 5Oct min period for 60min Each along X Y Z axes Safety EMC Safety Standards IEC 60950 1 1st Edition 2001 EN 60950 1 1st Edition 2001 A11 Withstand Vo...

Page 7: ...2 3 Mechanical Drawing 5...

Page 8: ...controller and PFC circuit to manage battery intelligently and to provide highly reliable operations Before using BP A read all instructions and precautions marking on this manual 3 1 Front Panel Ope...

Page 9: ...ing Charge Solid Green Charging Failure or Wire Disconnection Red Blink 3 2 Rear Panel Operation STATUS DC OUTPUT PUSH FUSE DC 3 2 1 Ventilation Shaft Be sure to keep it a distance at least one inch f...

Page 10: ...tput fuse LED light off No AC power delivering Check input power connection Thermal shutdown Make sure the ventilation shaft is not obstructed Improve ventilation Lower the temperature Surrounding it...

Page 11: ...No 33 Rong Hsin Rd Pa Teh City Tao Yuan County Taiwan Phone 886 3 3661581 FAX 886 3 3676029 E mail sales cotek com tw http www cotek com tw 2005 08...

Reviews: