Standard Recommended Procedure 206-337 | Issue 10 | August 2017 | Page 13 of 18
Step 6:
Secure the ribbon fan-out assembly to the tray in the lower right corner using a cable tie
(Figure 15)
.
Step 7:
Route two loops of fiber from the fan-out body around the inside perimeter of the splice tray.
Step 8:
Clean the fibers per the manufacturer’s directions.
Step 9:
Mark and splice ribbons as described in the instruction provided with the splice tray.
______________________________________________________________________________________
Figure 15
Distribution
Connectorized Fibers Out
Cut only
fibers to
be spliced.
CO
Preroute two loops of fiber
in tray for splicing.
KPA-1789
CO Left
Distribution
Connectorized Fibers Out
CO-side
Ribbon In
CO
Preroute two loops of fiber
in tray for splicing.
KPA-1790
CO Right