Standard Recommended Procedure 003-1002-AEN | Issue 7 | January 2019 | Page 22 of 25

6.  Troubleshooting and Maintenance

6.1 Testing

Use the Fluke MultiFiber™ Pro Optical Power Meter and Test Kits for testing the MTP

®

 connections. Follow the 

Fluke Networks manual which can be found on-line at 

http://download.  ukenetworks.com/Download/Asset/MultiFiberPro_9827313_ENG_A_W.PDF. 

A sample test procedure can be seen in Figure 33.

Figure 33 * — Testing MTP Connections

*Figure 33 provided by Fluke Corporation and used with their permission.

Summary of Contents for EDGE8-01U

Page 1: ...unk Cable Placement with the Pulling Grip 5 4 2 2 Pulling Grip Removal 5 4 3 OPTIONAL Install CDF Bracket 7 4 4 InstallTrunk Cables from Either Side of the Housing 8 4 4 1 InstallingTrunk Cable Using...

Page 2: ...management ngers 3 Tools and Materials Required 3 1 Tools Phillips screwdriver Reel stand 3 2 Materials Hook and loop straps LCconnector adapter cleaning tool p n CLEANER PORT LC MTP connector cleani...

Page 3: ...nstalled in the rack Step 3 Install screws into the rack through the mounting brackets Step 4 If installing a 2U or 4U housing slide the ber management ngers onto the housing NOTE Installation of ber...

Page 4: ...utlined on the reel Observe This End Up arrows on reels or boxes Ensure that all ange bolts are tight prior to loading a reel for pulling Changes in temperature and humidity can cause the wooden cardb...

Page 5: ...e the corrugated reel from its protective shipping box or pallet Step 2 Place the cable reel on a reel stand so that the pulling grip cable will pay o the top of the reel Figure 4 NOTE Cables greater...

Page 6: ...furcation end of the coupler to separate the coupler s two halves Step 7 Remove the coupler halves from the trunk furcation body and dispose of the coupler assembly Figure 9 96 and 144 ber Trunks Step...

Page 7: ...a pass through IBU system Step 1 Align bracket within the same height of the 4U housing Step 2 Install bracket using two 12 24 screws Figure 11 Allow enough clearance when routing trunks from the brac...

Page 8: ...e the reel and press each trunk cable furcation plug into cradle Figure 12 double stack cradle or Figure 13 single stack cradle NOTE One double stack cradle shown in Figure 12 is provided with the tru...

Page 9: ...place Figure 14 Install Trunk Cable with Keyhole Adapter 4 5 InstallTrunk Cables from Rear of Housing If rear cable entry into the housing is desired or necessary the backplates must be turned 180 deg...

Page 10: ...lished in a location external to the housing the trunk plate may be removed to allow more room behind the housing Figure 16 Step 1 For 4U housing only Remove side panel from each side of the housing S...

Page 11: ...oad all trays from right to left bottom to top in the housing as seen from the back Step 4 Loop slack as shown in Figure 17 leaving enough slack to pull out trays without violating the minimum bend ra...

Page 12: ...access to mount the trunk cables and connect the trunk legs Figure 18 Lower Tilt down Drawer Step 4 From rear of housing feed connectorized MTP trunk connector legs through to the front of the housing...

Page 13: ...corner Tray 1 slot A insert port breakout module from the rear until it locks into place Load all trays from right to left bottom to top in the housing as seen from the back Step 2 Loop slack as shown...

Page 14: ...ls are not pinched in the process Figure 21 Install EDGE8 Module 4 9 Connect Jumpers to EDGE8 Modules CAUTION When removing the trays position yourself in the center of the rack and use both hands to...

Page 15: ...removed from the rear of the housing and install additional trunks Installer MUST obtain slack in the ber connected to the panels on the front side Without slack tension in the jumpers will result in...

Page 16: ...ables may occur Step 1 Open housing front door and pull out tray Ensure there is enough ber slack in the rear of the housing to allow for this movement Step 2 Remove dust caps from the front of the MT...

Page 17: ...e pre labeled for identi cation and promote a consistent labeling scheme Users must provide their own label maker and media for the frame or cabinet and hardware Labeling is best supported with use of...

Page 18: ...e 27 Recommended Labeling Guidelines Step 1 Frame Cabinet Location Figure 28 Identify location of frame or cabinet within the oor space grid coordinate system Preprint labels and adhere to front and b...

Page 19: ...t corner of the housing chassis Print two labels and adhere one to the front chassis door using the crop mark for alignment Adhere the second label to the label card on the inside of the door Figure 2...

Page 20: ...gh F to identify module position within the tray Figure 31 Module Label Location Step 5 Documentation Figure 32 Identify remote location termination and determine code to be printed It should only be...

Page 21: ...important to follow suite with previous de ned code indicating rack or cabinet ID patch panel ID and more speci cally the individual port or ber termination location One should cross reference the rec...

Page 22: ...cal Power Meter and Test Kits for testing the MTP connections Follow the Fluke Networks manual which can be found on line at http download ukenetworks com Download Asset MultiFiberPro_9827313_ENG_A_W...

Page 23: ...pull module out Step 4 Unplug MTP connector s in rear of module Step 5 Reverse process to install new module or panel if upgrading the network Figure 34 Replace EDGE8 Module 6 3 Remove Trunk Cable 6 3...

Page 24: ...dy up from the bottom using your fore nger Alternate method Insert a at head screwdriver into the hole in the cradle to pry up the furcation body Figure 36 RemoveTrunk Cable from U Clip Cradle 6 4 Cha...

Page 25: ...ropyl alcohol is ammable with a ashpoint at 54 F It can cause irritation to eyes on contact In case of contact ush eyes with water for at least 15 minutes Inhalation of vapors irritates the respirator...

Reviews: