Page 5
SRP 003-304 • Issue 9 • July 2004
Figure 6
8.3 To rack-mount the unit
, a universal
rack-mount kit (ordered separately) is required.
Remove the stabilizer bracket, rotate the top
bracket so the elliptical hole is exposed and
follow instructions supplied with the rack-
mount kit.
9.
Preparing the Cable
9.1
Route the incoming distribution (feeder)
cable through the fitting on the left at the base
of the unit.
9.2
Perform cable sheath removal steps per
instructions for the type of cable being
installed. Cut the cable to 2 meters (6 feet)
inside the unit.
NOTE:
Do not expose the bare fiber until you are
ready to terminate it.
9.3
Install a sheath retention clamp onto the
cable sheath as illustrated in Figure 6. If an
armored cable is used, install the ground clamp
before installing the sheath retention clamp.
Ground kits are purchased separately.
9.4
Armored cable (metallic cable sheath)
should be grounded using a ground clamp
(Figure 7).
Figure 7