IDC Pro 255 Service Manual
© 2016, Cornelius Inc.
- 25 -
Publication Number: 621058649SER
Purging The Syrup Lines
The purge process is performed as part of the “Syrup Line Cleaning & Sanitizing” section on page 26. If a BIB con-
tainer is replaced, the syrup lines need to be purged and sanitized. To purge the lines, perform the procedure in Table
17.
Table 17.
Step
Action
1
Ensure that the water and CO
2
are turned on. (initial setup only)
2
Display the keypad screen by tapping each corner
of the video screen Starting in the upper right cor-
ner (1) and continuing to tap each corner in a
Counter clockwise direction in a sequence of
1,2,3 and 4 as shown in Figure 45.
NOTE: As each corner is touched, a small
confirmation rectangle may
momentarily appear to confirm the
touch.
Figure 45.
3
Input the proper password for your access level
(technician) and press Enter.
Figure 46.
4
The Service UI screen is displayed.
Figure 47.
5
Press the Unit setup button as shown in Figure 47.
1
2
3
4
5
6
7
8
9
0
Enter
<
Unit Setup
UNIT SETUP