INDEX
INSTALLATION INDEX
Important Safeguards…………………………………………………….
1
I. The Installation of the System……………………………………………
2
1. The Style of the Installation………………………………………….
2
2. Steps of Installation………………………………………………...
3
II. The outlines description………………………………………………....
6
Ⅲ
.
.
Appendix I Lightning Proof and Surge Signal Proof… ……………..9
Appendix II The Cleaning of Clear Down Cover……………………..9
Appendix
Ⅲ
AC24VWire diameter and transmission Distanc
Comparison chart.................................................................................10
Appendix
Ⅳ
:
Wire Gauge Conversion Chart…………………….....11
OPERATION INDEX
Important Safeguards………………………………………………..........12
I. Description of Functions…………………………………………………..13
II. Setup of the Menu of the Dome Camera………………………………....15
III. Setup of the Dome Camera……………………………………………...18
1. Connection of the System…………………………………………….23
2. Setup of Coding Switch of Dome Camera……………………………24
3. Setup of the Protocol and the Default Baud Rate…………………….24
4. Setup of the Baud Rate of Communication…………………………..25
5. Selection of the Terminal Resistor of the Dome Camera…………….25
6.Shortcut control function……………………………………………...26
IV Technical data table……………………………………………………….28
V Troubleshooting……………………………………………………………29
VI Appendix
Ⅰ
: RS485 Bus Basic Knowledge………………………………..30