8/16
ALLY II UPS™
WARNING:
• Use only the rail clamp supplied with the ALLY II UPS™.
• Do not install rail clamp across separated rail sections.
CAUTION:
Always ensure that the ALLY II UPS™ is tightly and securely attached to the table prior to the start
of the surgical procedure. Improper or loose mounting of the system can lead to unintended
movement and may lead to injury.
5. Attach the foot pedal cable to the main unit. Ensure the connector locks in place.
6. Attach the power cord to the main unit (making sure it is firmly in place) and attach it to the nearest outlet. If an
extension cord is needed, make sure it is a medical grade cord suitable to withstand 125VAC/10 amps.
Note:
Position foot pedal within reach of operating room personnel actuating the ALLY II UPS™. It is recommended
to position the ALLY II UPS™ foot pedal separately from other foot pedals.
CAUTION:
Securely hold arm or manipulator before depressing foot pedal
7. Turn the power on and verify that the green light indicator is lit. Press and hold the foot pedal once. Release to
initialize the ALLY II UPS™. The ALLY II UPS™ arm can be moved by grasping the flexible arm and depressing
the foot pedal. Releasing the foot pedal locks the ALLY II UPS™ in place, holding the arm in a static position.
8.
Position the ALLY II UPS™ flexible arm out of the way prior to patient preparation. It is recommended to cover
the arm while prepping the patient.
Figure 2d:
ALLY II UPS™ in position in the ALLY II UPS™ rail clamp (shown to the left of the stirrup clamp. Operating
room staff may choose a different configuration or placement as appropriate.)
ALLY II UPS™ Rail Clamp
Stirrup Rail Clamp
ALLY II UPS™ Main Unit
Stirrup