LEK
LEK
LEK
Ø
ca 180 mm
!
5
3
1
4
2
30
GB
Connection to chimney
Rear connection to a masonry chimney
Make sure that the connector
gasket does not work loose when
the connection pipe is placed
on the connector. If further
sealing material is required, heat-
resistant sealant may be used.
The back panel must be installed before the stove is rear connected. Refer to the
chimney’s installation instructions to install the chimney. The following describes how
the chimney system is connected to the stove.
• The stove meets the requirements for connecting to chimneys
dimensioned for 350°C flue gas temperature.
• The external diameter of the connection sleeve is 150 mm.
• The stove requires a draft in the chimney of at least –12 Pa. The
draft is affected both by the length and area of the chimney, and
by how well sealed it is. Minimum recommended chimney length is
3.5 m and suitable cross section area is 150-200 cm² (140-160
mm in diameter).
• A flue with sharp bends and horizontal routing reduces the
draught in the chimney. Maximum horizontal flue is 1 m, on the
condition that the vertical flue length is at least 5 m.
• It must be possible to sweep the full length of the flue and the
soot hatches must be easily accessible.
• Carefully check that the chimney is sealed and that there is no
leakage around soot hatches and flue connections.
In the bag with these installation instructions
are two wing screws for the cover.
CHIMNEY
Summary of Contents for C690 Style
Page 1: ...LEK LEK Installation instruction www contura eu C 690...
Page 23: ......