15
INSTALLATION CONTINUED
INPUT WIRING
Input Wiring
Input wiring is performed at the input terminal block. It is recommended that all wiring is performed according to
NEC standards and local codes.
*** WARNING ***
RISK OF ELECTRICAL SHOCK
THE UPS RECEIVES POWER FROM MORE THAN ONE SOURCE.
BE SURE ALL UTILITY CIRCUIT BREAKERS ARE IN THE OFF POSITION AND
THE BATTERY CONNECTOR IS UNPLUGGED BEFORE INSTALLATION OR SERVICING.
Input hardwire terminals, Torque = 110 Inch Lbs.
REAR VIEW
INPUT TERMINALS
“S” CABINET
INPUT GROUND TERMINAL
“T” CABINET
REAR VIEW
INPUT GROUND
TERMINAL
INPUT TERMINALS
A
N
G
X1
X2
L1
L2
X3
XN
G
NOTE: 240/120V or 208/120V input MUST have 2 hots, neutral and ground for
proper operation and to prevent possible damage.
Summary of Contents for MODEL ES
Page 51: ...51 APPENDIX A RELATIVE DRAWINGS SCHEMATICS APPENDIX A ...
Page 57: ...57 NOTES ...