finish framing - after appliance installation
Drywall
Insulation
Ceiling
see-thru double built out
Ref
CL38
CL50
E
16 3/16” (41.1cm)
16 3/16” (41.1cm)
N* / **
14 1/4” (36.2m)
14 1/4” (36.2m)
O*
25 11/16 (65.2cm)
25 11/16 (65.2cm)
P*
4” (10.1cm) Max
4” (10.1cm) Max
* Finishing material must be considered with the protrusion (i.e. P includes framing and
finish material). If desired, side and bottom protrusions can be installed with 4” (10.1cm)
Max.
N*
E
O*
P*
Shaded components (finish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its final position and venting
connected.
note:
minimum framing
** This is a recommended dimension when mounting electronics above the appliance.
Otherwise, it can be as minimal as construction permits.