EN
W415-1708 / 07.04.17
43
finish framing - after appliance installation
see-thru flush
Drywall
Insulation
Ceiling
Ref
CL38
CL50
K
39 15/16” (101.4cm)
39 15/16” (101.4cm)
E
16 3/16” (41.1cm)
16 3/16” (41.1cm)
F
53 13/16” (136.7cm)
65 13/16” (167.2cm)
J
Optional - Appliance does not need to be elevated above floor
L
74” (188cm)
74” (188cm)
K
E
F
J
L
Shaded components (finish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its final position and venting
connected.
note:
minimum framing