25
W415-0889 / A / 08.11.10
* Allow for
fi
nished
fl
oor and hearth thickness when setting these dimensions.
** When constructing the enclosure allow for
fi
nishing material thickness to maintain clearances.
DO NOT BUILD INTO THIS AREA - IT MUST BE LEFT
CLEAR TO PROVIDE ADEQUATE CLEARANCE FOR
THE VENT IN THIS 14” WIDE AREA CENTERED
ALONG THE FRONT OF THE APPLIANCE. NO
COMBUSTIBLES ARE ALLOWED.
!
WARNING
84”*
41”*
20
¼”**
40 ¾”
3
½”
MAX
NOTE: Three braces are
required (as nailers) if using
optional 4-sided frame kit.
1
½”
MAX
14”
MIN