2
W415-0814 / A / 03.17.11
NOTE: changes, other than editorial, are denoted by a vertical line in the margin.
TABLE OF CONTENTS
1.0 INSTALLATION
OVERVIEW
3
2.0 INTRODUCTION
4
2.1 DIMENSIONS
5
2.1.1 ISLAND
5
2.1.2 OPEN-END
5
2.1.3 PENINSULA
5
2.1.4 SEE-THRU
5
2.2 GENERAL
INSTRUCTIONS
6
2.3 GENERAL
INFORMATION
7
2.4
RATING PLATE INFORMATION
7
3.0 VENTING
8
3.1
VENTING SAFETY SWITCH
8
3.2
HIGH LIMIT SWITCH
9
3.3 VENT
ACTION
CHECK
9
4.0 INSTALLATION
9
4.1 GAS
INSTALLATION
10
5.0 FRAMING
11
5.1
MINIMUM CLEARANCE TO COMBUSTIBLES
11
5.2 PENINSULA
11
5.2.1 INSTALLATION
11
5.2.2
COUNTER TOP / BAR INSTALLATION
12
5.2.3
BRICK PANEL INSTALLATION
12
5.2.4 FACING
13
5.2.5 FINISHING
13
5.3 OPEN-END
13
5.3.1 INSTALLATION
13
5.3.2
BRICK PANEL INSTALLATION
14
5.3.3 FACING
14
5.3.4 FINISHING
14
5.4 SEE-THRU
15
5.4.1 INSTALLATION
15
5.4.2
BRICK PANEL INSTALLATION
15
5.4.3 FACING
15
5.4.4 FINISHING
16
5.5 ISLAND
16
5.5.1 INSTALLATION
16
5.5.2
BRICK PANEL INSTALLATION
16
5.5.3 FACING
17
5.5.4 FINISHING
17
5.6
MINIMUM MANTEL CLEARANCES
18
6.0 FINISHING
19
6.1
HEAT SHIELD STAND-OFF REMOVAL (SEE-THRU INSTALLATION ONLY)
19
6.2 DOOR
INSTALLATION
19
6.3
END DOOR INSTALLATION
19
6.4 LOG
PLACEMENT
20
6.5 CHARCOAL
EMBERS
21
6.6 LOGO
PLACEMENT
21
6.7 LOUVRE
INSTALLATION
22
7.0
OPTIONAL BLOWER INSTALLATION
22
8.0 OPERATION
24
9.0 ADJUSTMENTS
25
9.1 PILOT
BURNER
ADJUSTMENT
25
9.2 VENTURI
ADJUSTMENT
25
9.3 FLAME
CHARACTERISTICS
26
10.0 MAINTENANCE
26
10.1
CARE OF GLASS
27
10.2
CARE OF PLATED PARTS
27
11.0 REPLACEMENTS
28
12.0 TROUBLE
SHOOTING
32
13.0 WARRANTY
34
14.0 SERVICE
HISTORY
35