25
7. Commissioning
Acceptance test (in case of industrial/public use):
Before first use and after any significant modifications, the installation (including the electrical
connections) must be inspected by an official expert.
A yearly inspection by an expert is required.
At least every 4 years, an acceptance test must be carried out by an expert.
Ceiling, wall or crossbeam installation
• If you want to install the device to the ceiling, a wall or a suitable crossbeam system, attach the effect light to the
mounting surface with its mounting bracket and mounting material suitable for the attachment surface and able
to carry the weight of the effect light.
• Matching adapter clamps may be required for installation to a crossbeam system.
• Use self-securing nuts or screws size M10 at the attachment point for attachment.
• Additionally secure the installation with a suitable and certified safety retention rope or safety net with a load
carrying capacity of 12 times the effect light. The safety retention rope or the net must be designed to support
the effect light in the event of failure of the main support system independently of the main attachment. The effect
light must be caught after free fall of no more than 20cm if the main support system is defective.