![Conergy IPG 4000 Operating Manual Download Page 57](http://html.mh-extra.com/html/conergy/ipg-4000/ipg-4000_operating-manual_2652114057.webp)
5 6
In st ru c t io n m an u al
C o n e r g y IP G s t r in g in v e r t e r s e r ie s
8 R e m o v a l
E
N
G
L
IS
H
3. Release the mains connector cable by inserting a
screwdriver into the connector socket.
Fig. 8-1: Releasing the mains cable
4. Turn the screwdriver slightly.
5. Pull the connector from the socket.
6. Release the solar cables by pressing the locking clip of the
connector plug manually or by using the Multi-Contact key.
7. Remove the solar cables.
8. Seal all connections with sealing plugs.
9. Release the two fixing screws on the bottom of the string
inverter.
10.Remove the string inverter from the wall.
Take care to ensure that the sealing plugs are correctly in
place. Otherwise, the connections will not be protected
against humidity.
CAUTION!
Risk of burn!
The cooling unit can heat up to 90°C.
| Allow a few minutes before removing the inverter from the
wall.