![Conergy IPG 4000 Operating Manual Download Page 34](http://html.mh-extra.com/html/conergy/ipg-4000/ipg-4000_operating-manual_2652114034.webp)
C o n e r g y IP G s t r in g in v e r t e r s e r ie s
In st ru c t io n m an u al
3 3
6 In s t a lla t io n a n d c o m m is s io n in g
E
N
G
L
IS
H
6
In s t a lla t io n a n d c o m m is s io n in g
6.1
Basic safety instructions
Before starting any work on electrical installations please
observe the following safety rules:
| Disconnecting from the mains
Disconnect the voltage from the device.
| Secure against being switched back on
| Make sure power is disconnected
Make sure power is disconnected from all poles, i.e. check
all phases against zero/earth.
| Earthing and short-circuiting
The background to earthing and short-circuiting is that
disconnected sections of wiring which do not run in
parallel can recharge.
| Cover nearby live parts.
DANGER!
A second person must be present during all work on live
system parts and leads. In the event of an unforeseen
electrical accident, that person must be able to switch off the
power supply and provide aid.
WARNING!
Risks from electrical installations!
When commissioning, there may be risks from electrical
installations despite careful installation and compliance with
the basic safety instructions. These include:
| Direct contact with live system parts
| Electrostatic processes
| Short circuits and overloading