![Conergy IPG 4000 Operating Manual Download Page 49](http://html.mh-extra.com/html/conergy/ipg-4000/ipg-4000_operating-manual_2652114049.webp)
4 8
In st ru c t io n m an u al
C o n e r g y IP G s t r in g in v e r t e r s e r ie s
6 In s t a lla t io n a n d c o m m is s io n in g
E
N
G
L
IS
H
LED indicators during commissioning
Ready
Solar
system
Grid
Fault
M eaning
After switching on, approx. 10 seconds may elapse before
the LED indicators are illuminated.
U
SG
≥
250 V
DC
,
internal electronic
systems are
supplied
30-40 seconds may elapse before test of the LED
indicators.
Internal test of the
LEDs
Preparation for the power feed to the grid may last 2–3
minutes.
Preparation of the
power feed to the
grid connection:
Audible clicking of
the relay
Power feed to the
grid
Grid power
available, stand-by
operation of the
inverter
LED is illuminated
LED is flashing
(LED lights up regularly)
The status of this LED indicator has no
significance for the current information
displayed.
LED is off