6.3
Connections
All connections of the Conergy IPG string inverter series
inverters are accessible externally and protected against
accidental contact.
Fig. 6-1: Connections of the string inverter
(1)
CAN In
Connection of previous inverter or
to Conergy SunReader
(2)
CAN Out
Connection of next inverter
A 120
Ω
terminator must be installed at the end of a CAN
connection.
(3)
AC Out
Grid connection
(4)
CTRL
Connection for Conergy IPG easyconnect
or
external 230 V power supply for the Conergy IPG string
vision inverter series inverter display.
(5)
DC–
Solar system connections
(6)
DC+
Solar system connections
All connections are provided with sealing plugs on delivery.
(1) (2)
(3)
(4)
(5)
(6)